Full record / Mansfield Storage LLC MTT# 25- 002229 prehearing statement&valuation disclosure.pdf

Mansfield Storage LLC MTT# 25- 002229 prehearing statement&valuation disclosure.pdf

Mansfield Storage LLC, Petitioner Vs. City Of Detroit, Respondent · 25-002229-TT

← View full record

Text extracted from the reviewed PDF, organized by page. OCR and reading order may contain errors; confirm details in the PDF below.

Page 1

STATE OF MICHIGAN 

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS 

MICHIGAN TAX TRIBUNAL 

 

Petitioner: 

MANSFIELD STORAGE, LLC 

v 

Respondent: CITY OF DETROIT 

 

MTT Docket No.: 25-002229 

 

Petitioner’s Prehearing Statement 

 

Respondent’s Prehearing Statement 

 

Petitioner’s representative: 

 

Christopher P. Wylie 

Wylie Group LLC 

17963 Maple Hill Court 

Northville, MI. 48168 

(248) 773-5091 

cpw@wyliegroup.us 

 

Respondent’s representative: 

Kevin C Richard (P43417) 

 

City of Detroit Law Department 

 

Coleman A Young Municipal Center 

 

2 Woodward Avenue, Suite 500 

 

Detroit, Michigan 48226 

 

(313) 237-3061 

 

richkc@detroitmi.gov 

 

I. 

VALUATION INFORMATION: 

A. The true cash value (TCV), assessed value (AV), and taxable value (TV) for each 

parcel and tax year at issue as established by the Boards of Review: 

Parcel Number 

Year 

TCV 

AV 

TV 

22057119.003L 

2025 

$750,000 

$375,000 

$375,000 

22057119.003L 

2026 

$0 

$0 

$0 

 

B. Respondent’s contentions of TCV, state equalized value (SEV), and TV for each 

parcel and tax year at issue: 

Parcel Number 

Year 

TCV 

SEV 

TV 

22057119.003L 

2025 

$750,000 

$375,000 

$375,000 

22057119.003L 

2026 

$0 

$0 

$0 

 

C. Petitioner’s contentions of TCV, SEV, and TV for each parcel and tax year at issue 

(per Petitioner’s Petition and Motions to Amend, if applicable): 

Parcel Number 

Year 

TCV 

SEV 

TV 

22057119.003L 

2025 

$430,000 

$215,000 

$215,000 

22057119.003L 

2026 

$430,000 

$215,000 

$215,000

Page 2

MTT Docket No.: 25-002229 

Respondent’s Prehearing Statement, Page 2 of 4 

 

 

D. Amounts in dispute for the tax year(s) at issue: 

Parcel Number 

Year 

TCV 

SEV 

TV 

22057119.003L 

2025 

$320,000 

$160,000 

$160,000 

22057119.003L 

2026 

$430,000 

$215,000 

$215,000 

 

I. 

TAX INFORMATION: 

A. Have taxes been paid for each property for each tax year at issue? 

☒ Yes 

☐ No 

III. 

FACTUAL STATEMENT OF CLAIMS: 

A. Describe any additions or losses for each property for each tax year at issue (by 

parcel number and tax year): 

 

Respondent is unaware of any additions or losses to the subject property for the tax 

year at issue. 

B. Classification of each property for each tax year at issue (by parcel number): 

 

 

22057119.003L 

2025 

industrial 

 

 

22057119.003L 

2026 

retired 

 

C. Current use of each property for each tax year at issue, if different than above (by 

parcel number): 

Not applicable. 

D. Contention of highest and best use for each property for each tax year at issue, if 

different than property’s current use for each tax year at issue (by parcel number): 

Not applicable. 

E. 

Your factual statement of claims in support of your contentions, including additions 

and losses, if any (i.e., what facts are you relying on in support of your claim or defense?): 

Respondent contends the proposed assessment values for the subject property do not 

exceed 50% of the true cash value for the at issue tax year. 

Additionally, the subject parcel no longer exists as of the 2026 tax year due to 

combination with other parcels and retirement of the parcel number. 

F. 

If non-uniformity of assessment is alleged, what evidence will you rely upon in 

support of your contentions? 

Respondent does not believe there are any valid non-uniformity of assessment issues.

Page 3

MTT Docket No.: 25-002229 

Respondent’s Prehearing Statement, Page 3 of 4 

 

 

G. Affirmative Defenses (if any): 

 

Not applicable. 

IV. 

ISSUES TO BE LITIGATED: 

A. Factual Issues: 

What is the true cash value of the subject property as of December 31, 2024? 

B. Legal Issues: 

What are the assessed and taxable values of the subject property for the 2025 tax year? 

V. 

DO THE PLEADINGS NEED TO BE AMENDED TO CONFORM TO THE 

EVIDENCE? 

☐ Yes 

☒ No 

A. If yes, state all necessary amendments (a motion may be required to amend the 

pleadings): 

Not applicable. 

VI. 

ARE THERE CONSOLIDATION ISSUES? ☐ Yes 

☒ No 

A. If yes, state the cases, by docket number, that should be consolidated with this case (a 

motion may be required to consolidate the cases): 

VII. 

PENDING OR ANTICIPATED MOTIONS OR OUTSTANDING DISCOVERY 

ISSUES, IF ANY: 

A. Motions: 

None at this time. 

B. Discovery: 

1. Post valuation disclosure production of the appraisal work files of 

Petitioner’s appraiser. 

 

2. Possible additional post-valuation discovery pending a review of 

Petitioner’s valuation evidence.

Page 4

MTT Docket No.: 25-002229 

Respondent’s Prehearing Statement, Page 4 of 4 

 

 

VIII. WITNESSES – IDENTIFY THE NAME AND ADDRESS OF ANY PERSON WHO 

MAY TESTIFY AND PROVIDE A GENERAL SUMMARY OF THE SUBJECT 

AREA OF THE TESTIMONY OF EACH PERSON IDENTIFIED: 

• Stacey Palmer, MCAO, MCPPE, Office of the Chief Financial Officer, Office of the 

Assessor, City of Detroit, Coleman A Young Municipal Center, 2 Woodward Avenue, 

Suite 804, Detroit, Michigan 48226. Ms. Palmer may offer testimony necessary for 

Respondent to make its case, and rebuttal testimony as necessary. 

• Any and all witnesses listed by Petitioner. 

• Any and all necessary rebuttal witnesses. 

• Any and all custodians of the records. 

 

As provided by TTR 237, a person, other than a rebuttal witness, who is NOT identified as a witness in the prehearing 

statement, shall NOT be permitted to give testimony, unless, for good cause shown, the Tribunal permits the testimony 

to be taken. 

IX. 

NUMBER OF DAYS REQUIRED FOR HEARING: 

2 

X. 

DISCLOSURE AND TAXATION OF COSTS: Respondent reserves the right to request 

costs. 

CITY OF DETROIT 

 

/s/ Kevin C. Richard 

 

 

 

 

 

By: 

Kevin C. Richard (P43417) 

 

 

 

 

 

 

City of Detroit Law Department 

Coleman A. Young Municipal Center 

2 Woodward Avenue, Suite 500 

Detroit, MI 48226 

Date: September 8, 2026 

 

 

(313) 237-3061 

 

Failure to file and exchange this prehearing statement, as required by the Tribunal, shall result in the commencement 

of the prehearing conference as a show cause hearing. See TTR 231 and 237. See also MCL 205.732. 

 

PROOF OF SERVICE 

 

On September 8, 2026 I sent via Email a copy of Respondent’s 

Prehearing Statement with Valuation Disclosure in the instant matter to: 

 

Christopher P. Wylie 

cpw@wyliegroup.us 

 

I declare that the statement above is true to the best of my information, 

knowledge, and belief. 

 

 

 

 

 

/s/ Kevin C. Richard 

Dated: September 8, 2026 

Kevin C. Richard

Page 5

*** Information herein deemed reliable but not guaranteed***

WAYNE

County:

CITY OF DETROIT

Jurisdiction:

Printed on

Parcel Number:

22057119.003L

154,032C

366,500

270,500

96,000

2024

375,500S

375,500

279,500

96,000

2025

0

0

0

0

2026

0

0

0

0

2027

Taxable

Value

Tribunal/

Other

Board of

Review

Assessed

Value

Building

Value

Land

Value

Year

 * Factors *

Description Frontage Depth Front Depth Rate %Adj. Reason Value

SQ FT RATE BY SIZE 76,796.280 Sq Ft 2.60 100 199,670

 1.76 Total Acres Total Est. Land Value = 199,670

Land Value Estimates for Land Table INDP.INDP-INDUSTRIAL PRIME GROUP 

DAA 04/28/2016 TYL-REASSE

Who When What

Level

Rolling

Low

High

Landscaped

Swamp

Wooded

Pond

Waterfront

Ravine

Wetland

Flood Plain

X

 

X

 

 

 

 

 

 

 

 

 

 

Topography of 

Site

Dirt Road

Gravel Road

Paved Road

Storm Sewer

Sidewalk

Water

Sewer

Electric

Gas

Curb

Street Lights

Standard Utilities

Underground Utils.

 

 

X

X

X

X

X

X

X

 

X

X

 

Public

Improvements

Vacant

 

Improved

X

The Equalizer. Copyright (c) 1999 - 2009.

Licensed To: City of Detroit, County of

Wayne, Michigan

Split/Comb. on 11/25/2025 completed

11/25/2025 DEVLIND TAXPAYER REQUEST;

Parent Parcel(s): 22057121.001,

22057119.003L, 22057120.005L;

Child Parcel(s): 22057120.006;

-----------------------------------------

Comments/Influences

E MANSFIELD ALL THAT PT OF W 1/2 OF NE

1/4 OFSEC 25 T1S R10E DESC AS FOLS; BEG

AT A PTE ON THE E'LY LINE OF MANSFIELD

AVE (65 FT WD)SD PTE BGN 0D 03M W 305 FT

FROM THE NE COROF MANSFIELD AVE &

FULLERTON AVE (66 FT WD); TH ALG THE ELY

LINE OF MANSFIELD AVE N 0D 03M W 200 FT

TO A PTE; TH S 89D 43M E 146 FT TO A PTE;

TH N 0D 03M W 150 FTTO A PTE; TH S 89D

43M E 126.43 FT TO A PTE; TH N 0D 04M E

201.33FT TO A PTE ON THE S LINE OF

GLENDALE AVE (56 FT WD); TH S 89D43M E 22

FT ALG SD S LINE TO A PTE; TH S 0D 04M W

474.33 FT TO APTE; TH IN A W'LY DIRECTION

THE EXTENSION OF THE N'LY LINE OF AN

EXISTING BLDG 112.80 FT; TH IN A S'LY

DIRECTION, 6 FT W OF SD BLDG77 FT; TH N

89D 43M W 180.40 FT TO P O B 22/--- 76

464 SQ FT 1.7553 AC

Split on 11/25/2025 with 22057121.001,

22057120.005L into 22057120.006;

Tax Description

MANSFIELD STORAGE LLC

7871 CHUBB ROAD

NORTHVILLE MI 48168

Owner's Name/Address

12700 MANSFIELD

Property Address

2027 Est TCV 0 TCV/TFA: 0.00

WARD#: 22

P.R.E. 0% 

School: DETROIT CITY SCHOOL DISTRICT

Status

Number

Date

Building Permit(s)

Zoning: M4

Class: RETIRED SPLIT/COMB

100.0

DEED

34483/1202

21-NOT USED/OTHER

WD

02/28/2001

405,000

J B CALC ENTERPRISES

LIBERTY STEEL PRODUCTS INC

0.0

PROPERTY TRANSFER 

92031:45550

21-NOT USED/OTHER

PTA

03/01/2001

405,000

0.0

PROPERTY TRANSFER 

13-GOVERNMENT

PTA

10/06/2022

186,000

JB CALC ENTERPRISES

WAYNE COUNTY TREASURER

100.0

PROPERTY TRANSFER 

21-NOT USED/OTHER

PTA

07/23/2024

1

MANSFIELD STORAGE LLC

JB CALC ENTERPRISES

Prcnt.

Trans.

Verified

By

Liber

& Page

Terms of Sale

Inst.

Type

Sale

Date

Sale

Price

Grantee

Grantor

09/08/2026

Page 6

Bsmnt Insul.

 

Thickness

 

 (40) Exterior Wall:

 8985 Steel Frame

 (39) Miscellaneous:

 (14) Roof Cover:

 (13) Roof Structure: Slope=0 

Incandescent

Fluorescent

Mercury

Sodium Vapor

Transformer

 

 

 

 

 

Flex Conduit

Rigid Conduit

Armored Cable

Non-Metalic

Bus Duct

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Fixtures:

Outlets:

 (11) Electric and Lighting:

Hand Fired

Boiler

 

 

Coal

Stoker

 

 

Gas

Oil

 

 

 (10) Heating and Cooling:

 (9) Sprinklers:

Urinals

Wash Bowls

Water Heaters

Wash Fountains

Water Softeners

 

 

 

 

 

Total Fixtures

3-Piece Baths

2-Piece Baths

Shower Stalls

Toilets

 

 

 

 

 

Few

None

 

 

Average

Typical

 

 

Many

Above Ave.

 

 

 (8) Plumbing:

 (7) Interior:

 (6) Ceiling:

 (5) Floor Cover:

 (4) Floor Structure:

 (3) Frame:

Block

 

Brick/Stone

 

Poured Conc.

X

Footings

 

 (2) Foundation:

 (1) Excavation/Site Prep:

<<<<< Calculator Cost Computations >>>>>

 Class: C Quality: Average

Stories: 1 Story Height: 26 Perimeter: 593

Overall Building Height: 26

 

Base Rate for Upper Floors = 97.72

 

(10) Heating system: Forced Air Furnace Cost/SqFt: 14.35 100%

Adjusted Square Foot Cost for Upper Floors = 112.07

 

Total Floor Area: 14,548 Base Cost New of Upper Floors = 1,630,394

 

 Reproduction/Replacement Cost = 1,630,394

Eff.Age:37 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 47 /100/100/100/47.0

 Total Depreciated Cost = 766,285

 

<<<<< Segregated Cost Computations >>>>>

Costs taken from Segregated Cost Section 4: Garages, Industrials, Warehouses

 Cost # or Height Storys 

Item Desciption Col. Rate SqFt Adj. Adj. Cost

 

(39) Miscellaneous

Canopies & Marquees:

Steel Frame 1 Up 46.90 8985 1.000 1.000 421,397

 

 Total Cost of Lump-Sum Items = 421,397

 Total Cost New = 421,397

<<<<< Calculations too long. See Valuation printout for complete pricing. >>>>>

 ** ** Calculator Cost Data ** **

Quality: Average 

Heat#1: Forced Air Furnace 100%

Heat#2: Electric, Cable or Baseboard 0%

Ave. SqFt/Story: 14548

Ave. Perimeter: 593

Has Elevators:

 

 *** Basement Info ***

Area:

Perimeter:

Type:

Heat:

 

 * Mezzanine Info *

Area #1:

Type #1:

Area #2:

Type #2:

 

 * Sprinkler Info *

Area:

Type: Average

Low

X

Ave.

 

Above Ave.

 

High

 

Construction Cost

Comments:

Overall Bldg

Height

26

Year Built

Remodeled

1953

 

Depr. Table : 2%

Effective Age : 37

Physical %Good: 47

Func. %Good : 100

Economic %Good: 100

Class: C

Floor Area: 14,548

Gross Bldg Area: 30,337

Stories Above Grd: 1

Average Sty Hght : 26

Bsmnt Wall Hght 

Desc. of Bldg/Section: BLDG. 1, SEC. 1

Calculator Occupancy: Industrial - Light Manufacturing

*** Information herein deemed reliable but not guaranteed***

Commercial/Industrial Building/Section 1 of 6

Printed on

Parcel Number:

22057119.003L

09/08/2026

Page 7

Bsmnt Insul.

 

Thickness

 

 (40) Exterior Wall:

 (39) Miscellaneous:

 (14) Roof Cover:

 (13) Roof Structure: Slope=0 

Incandescent

Fluorescent

Mercury

Sodium Vapor

Transformer

 

 

 

 

 

Flex Conduit

Rigid Conduit

Armored Cable

Non-Metalic

Bus Duct

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Fixtures:

Outlets:

 (11) Electric and Lighting:

Hand Fired

Boiler

 

 

Coal

Stoker

 

 

Gas

Oil

 

 

 (10) Heating and Cooling:

 (9) Sprinklers:

Urinals

Wash Bowls

Water Heaters

Wash Fountains

Water Softeners

 

 

 

 

 

Total Fixtures

3-Piece Baths

2-Piece Baths

Shower Stalls

Toilets

 

 

 

 

 

Few

None

 

 

Average

Typical

 

 

Many

Above Ave.

 

 

 (8) Plumbing:

 (7) Interior:

 (6) Ceiling:

 (5) Floor Cover:

 (4) Floor Structure:

 (3) Frame:

Block

 

Brick/Stone

 

Poured Conc.

X

Footings

 

 (2) Foundation:

 (1) Excavation/Site Prep:

<<<<< Calculator Cost Computations >>>>>

 Class: C Quality: Average

Stories: 1 Story Height: 20 Perimeter: 258

Overall Building Height: 20

 

Base Rate for Upper Floors = 96.28

 

(10) Heating system: Forced Air Furnace Cost/SqFt: 14.14 100%

Adjusted Square Foot Cost for Upper Floors = 110.42

 

Total Floor Area: 3,853 Base Cost New of Upper Floors = 425,448

 

 Reproduction/Replacement Cost = 425,448

Eff.Age:37 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 47 /100/100/100/47.0

 Total Depreciated Cost = 199,961

 

<<<<< Segregated Cost Computations >>>>>

Costs taken from Segregated Cost Section 4: Garages, Industrials, Warehouses

 Cost # or Height Storys 

Item Desciption Col. Rate SqFt Adj. Adj. Cost

 

 Total Cost New = 0

Architectural Multiplier: 1.07

 

 Reproduction/Replacement Cost = 0

Eff.Age:37 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 47 /100/100/100/47.0

 Total Depreciated Cost = 0

<<<<< Calculations too long. See Valuation printout for complete pricing. >>>>>

 ** ** Calculator Cost Data ** **

Quality: Average 

Heat#1: Forced Air Furnace 100%

Heat#2: Electric, Cable or Baseboard 0%

Ave. SqFt/Story: 3853

Ave. Perimeter: 258

Has Elevators:

 

 *** Basement Info ***

Area:

Perimeter:

Type:

Heat:

 

 * Mezzanine Info *

Area #1:

Type #1:

Area #2:

Type #2:

 

 * Sprinkler Info *

Area:

Type: Average

Low

X

Ave.

 

Above Ave.

 

High

 

Construction Cost

Comments:

Overall Bldg

Height

20

Year Built

Remodeled

1967

 

Depr. Table : 2%

Effective Age : 37

Physical %Good: 47

Func. %Good : 100

Economic %Good: 100

Class: C

Floor Area: 3,853

Gross Bldg Area: 30,337

Stories Above Grd: 1

Average Sty Hght : 20

Bsmnt Wall Hght 

Desc. of Bldg/Section: BLDG. 1, SEC. 2

Calculator Occupancy: Industrial - Light Manufacturing

*** Information herein deemed reliable but not guaranteed***

Commercial/Industrial Building/Section 2 of 6

Printed on

Parcel Number:

22057119.003L

09/08/2026

Page 8

Bsmnt Insul.

 

Thickness

 

 (40) Exterior Wall:

 (39) Miscellaneous:

 (14) Roof Cover:

 (13) Roof Structure: Slope=0 

Incandescent

Fluorescent

Mercury

Sodium Vapor

Transformer

 

 

 

 

 

Flex Conduit

Rigid Conduit

Armored Cable

Non-Metalic

Bus Duct

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Fixtures:

Outlets:

 (11) Electric and Lighting:

Hand Fired

Boiler

 

 

Coal

Stoker

 

 

Gas

Oil

 

 

 (10) Heating and Cooling:

 (9) Sprinklers:

Urinals

Wash Bowls

Water Heaters

Wash Fountains

Water Softeners

 

 

 

 

 

Total Fixtures

3-Piece Baths

2-Piece Baths

Shower Stalls

Toilets

 

 

 

 

 

Few

None

 

 

Average

Typical

 

 

Many

Above Ave.

 

 

 (8) Plumbing:

 (7) Interior:

 (6) Ceiling:

 (5) Floor Cover:

 (4) Floor Structure:

 (3) Frame:

Block

 

Brick/Stone

 

Poured Conc.

X

Footings

 

 (2) Foundation:

 (1) Excavation/Site Prep:

<<<<< Calculator Cost Computations >>>>>

 Class: C Quality: Average

Stories: 1 Story Height: 20 Perimeter: 252

Overall Building Height: 20

 

Base Rate for Upper Floors = 108.03

 

(10) Heating system: Forced Air Furnace Cost/SqFt: 18.94 100%

Adjusted Square Foot Cost for Upper Floors = 126.97

 

Total Floor Area: 1,651 Base Cost New of Upper Floors = 209,628

 

 Reproduction/Replacement Cost = 209,628

Eff.Age:34 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 46 /100/100/100/46.0

 Total Depreciated Cost = 96,429

 

<<<<< Segregated Cost Computations >>>>>

Costs taken from Segregated Cost Section 4: Garages, Industrials, Warehouses

 Cost # or Height Storys 

Item Desciption Col. Rate SqFt Adj. Adj. Cost

 

 Total Cost New = 0

Architectural Multiplier: 1.07

 

 Reproduction/Replacement Cost = 0

Eff.Age:34 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 46 /100/100/100/46.0

 Total Depreciated Cost = 0

<<<<< Calculations too long. See Valuation printout for complete pricing. >>>>>

 ** ** Calculator Cost Data ** **

Quality: Average 

Heat#1: Forced Air Furnace 100%

Heat#2: Electric, Cable or Baseboard 0%

Ave. SqFt/Story: 1651

Ave. Perimeter: 252

Has Elevators:

 

 *** Basement Info ***

Area:

Perimeter:

Type:

Heat:

 

 * Mezzanine Info *

Area #1:

Type #1:

Area #2:

Type #2:

 

 * Sprinkler Info *

Area:

Type: Average

Low

X

Ave.

 

Above Ave.

 

High

 

Construction Cost

Comments:

Overall Bldg

Height

20

Year Built

Remodeled

1949

 

Depr. Table : 2.25%

Effective Age : 34

Physical %Good: 46

Func. %Good : 100

Economic %Good: 100

Class: C

Floor Area: 1,651

Gross Bldg Area: 30,337

Stories Above Grd: 1

Average Sty Hght : 20

Bsmnt Wall Hght 

Desc. of Bldg/Section: BLDG. 1, SEC. 3

Calculator Occupancy: Warehouses - Storage

*** Information herein deemed reliable but not guaranteed***

Commercial/Industrial Building/Section 3 of 6

Printed on

Parcel Number:

22057119.003L

09/08/2026

Page 9

Bsmnt Insul.

 

Thickness

 

 (40) Exterior Wall:

 (39) Miscellaneous:

 (14) Roof Cover:

 (13) Roof Structure: Slope=0 

Incandescent

Fluorescent

Mercury

Sodium Vapor

Transformer

 

 

 

 

 

Flex Conduit

Rigid Conduit

Armored Cable

Non-Metalic

Bus Duct

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Fixtures:

Outlets:

 (11) Electric and Lighting:

Hand Fired

Boiler

 

 

Coal

Stoker

 

 

Gas

Oil

 

 

 (10) Heating and Cooling:

 (9) Sprinklers:

Urinals

Wash Bowls

Water Heaters

Wash Fountains

Water Softeners

 

 

 

 

 

Total Fixtures

3-Piece Baths

2-Piece Baths

Shower Stalls

Toilets

 

 

 

 

 

Few

None

 

 

Average

Typical

 

 

Many

Above Ave.

 

 

 (8) Plumbing:

 (7) Interior:

 (6) Ceiling:

 (5) Floor Cover:

 (4) Floor Structure:

 (3) Frame:

Block

 

Brick/Stone

 

Poured Conc.

X

Footings

 

 (2) Foundation:

 (1) Excavation/Site Prep:

<<<<< Calculator Cost Computations >>>>>

 Class: C Quality: Average

Stories: 1 Story Height: 24 Perimeter: 419

Overall Building Height: 24

 

Base Rate for Upper Floors = 83.32

 

(10) Heating system: Forced Air Furnace Cost/SqFt: 14.61 100%

Adjusted Square Foot Cost for Upper Floors = 97.93

 

Total Floor Area: 7,845 Base Cost New of Upper Floors = 768,260

 

 Reproduction/Replacement Cost = 768,260

Eff.Age:34 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 46 /100/100/100/46.0

 Total Depreciated Cost = 353,400

 

<<<<< Segregated Cost Computations >>>>>

Costs taken from Segregated Cost Section 4: Garages, Industrials, Warehouses

 Cost # or Height Storys 

Item Desciption Col. Rate SqFt Adj. Adj. Cost

 

 Total Cost New = 0

Architectural Multiplier: 1.07

 

 Reproduction/Replacement Cost = 0

Eff.Age:34 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 46 /100/100/100/46.0

 Total Depreciated Cost = 0

<<<<< Calculations too long. See Valuation printout for complete pricing. >>>>>

 ** ** Calculator Cost Data ** **

Quality: Average 

Heat#1: Forced Air Furnace 100%

Heat#2: Electric, Cable or Baseboard 0%

Ave. SqFt/Story: 7845

Ave. Perimeter: 419

Has Elevators:

 

 *** Basement Info ***

Area:

Perimeter:

Type:

Heat:

 

 * Mezzanine Info *

Area #1:

Type #1:

Area #2:

Type #2:

 

 * Sprinkler Info *

Area:

Type: Average

Low

X

Ave.

 

Above Ave.

 

High

 

Construction Cost

Comments:

Overall Bldg

Height

24

Year Built

Remodeled

1950

 

Depr. Table : 2.25%

Effective Age : 34

Physical %Good: 46

Func. %Good : 100

Economic %Good: 100

Class: C

Floor Area: 7,845

Gross Bldg Area: 30,337

Stories Above Grd: 1

Average Sty Hght : 24

Bsmnt Wall Hght 

Desc. of Bldg/Section: BLDG. 1, SEC. 4

Calculator Occupancy: Warehouses - Storage

*** Information herein deemed reliable but not guaranteed***

Commercial/Industrial Building/Section 4 of 6

Printed on

Parcel Number:

22057119.003L

09/08/2026

Page 10

Bsmnt Insul.

 

Thickness

 

 (40) Exterior Wall:

 (39) Miscellaneous:

 (14) Roof Cover:

 (13) Roof Structure: Slope=0 

Incandescent

Fluorescent

Mercury

Sodium Vapor

Transformer

 

 

 

 

 

Flex Conduit

Rigid Conduit

Armored Cable

Non-Metalic

Bus Duct

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Fixtures:

Outlets:

 (11) Electric and Lighting:

Hand Fired

Boiler

 

 

Coal

Stoker

 

 

Gas

Oil

 

 

 (10) Heating and Cooling:

 (9) Sprinklers:

Urinals

Wash Bowls

Water Heaters

Wash Fountains

Water Softeners

 

 

 

 

 

Total Fixtures

3-Piece Baths

2-Piece Baths

Shower Stalls

Toilets

 

 

 

 

 

Few

None

 

 

Average

Typical

 

 

Many

Above Ave.

 

 

 (8) Plumbing:

 (7) Interior:

 (6) Ceiling:

 (5) Floor Cover:

 (4) Floor Structure:

 (3) Frame:

Block

 

Brick/Stone

 

Poured Conc.

X

Footings

 

 (2) Foundation:

 (1) Excavation/Site Prep:

<<<<< Calculator Cost Computations >>>>>

 Class: C Quality: Average

Stories: 1 Story Height: 20 Perimeter: 57

Overall Building Height: 20

 

Base Rate for Upper Floors = 112.33

 

(10) Heating system: Forced Air Furnace Cost/SqFt: 19.69 100%

Adjusted Square Foot Cost for Upper Floors = 132.02

 

Total Floor Area: 340 Base Cost New of Upper Floors = 44,887

 

 Reproduction/Replacement Cost = 44,887

Eff.Age:34 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 46 /100/100/100/46.0

 Total Depreciated Cost = 20,648

 

<<<<< Segregated Cost Computations >>>>>

Costs taken from Segregated Cost Section 4: Garages, Industrials, Warehouses

 Cost # or Height Storys 

Item Desciption Col. Rate SqFt Adj. Adj. Cost

 

 Total Cost New = 0

Architectural Multiplier: 1.07

 

 Reproduction/Replacement Cost = 0

Eff.Age:34 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 46 /100/100/100/46.0

 Total Depreciated Cost = 0

<<<<< Calculations too long. See Valuation printout for complete pricing. >>>>>

 ** ** Calculator Cost Data ** **

Quality: Average 

Heat#1: Forced Air Furnace 100%

Heat#2: Electric, Cable or Baseboard 0%

Ave. SqFt/Story: 340

Ave. Perimeter: 57

Has Elevators:

 

 *** Basement Info ***

Area:

Perimeter:

Type:

Heat:

 

 * Mezzanine Info *

Area #1:

Type #1:

Area #2:

Type #2:

 

 * Sprinkler Info *

Area:

Type: Average

Low

X

Ave.

 

Above Ave.

 

High

 

Construction Cost

Comments:

Overall Bldg

Height

20

Year Built

Remodeled

1951

 

Depr. Table : 2.25%

Effective Age : 34

Physical %Good: 46

Func. %Good : 100

Economic %Good: 100

Class: C

Floor Area: 340

Gross Bldg Area: 30,337

Stories Above Grd: 1

Average Sty Hght : 20

Bsmnt Wall Hght 

Desc. of Bldg/Section: BLDG. 1, SEC. 5

Calculator Occupancy: Warehouses - Storage

*** Information herein deemed reliable but not guaranteed***

Commercial/Industrial Building/Section 5 of 6

Printed on

Parcel Number:

22057119.003L

09/08/2026

Page 11

Bsmnt Insul.

 

Thickness

 

 (40) Exterior Wall:

 (39) Miscellaneous:

 (14) Roof Cover:

 (13) Roof Structure: Slope=0 

Incandescent

Fluorescent

Mercury

Sodium Vapor

Transformer

 

 

 

 

 

Flex Conduit

Rigid Conduit

Armored Cable

Non-Metalic

Bus Duct

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Few

Average

Many

Unfinished

Typical

 

 

 

 

 

Fixtures:

Outlets:

 (11) Electric and Lighting:

Hand Fired

Boiler

 

 

Coal

Stoker

 

 

Gas

Oil

 

 

 (10) Heating and Cooling:

 (9) Sprinklers:

Urinals

Wash Bowls

Water Heaters

Wash Fountains

Water Softeners

 

 

 

 

 

Total Fixtures

3-Piece Baths

2-Piece Baths

Shower Stalls

Toilets

 

 

 

 

 

Few

None

 

 

Average

Typical

 

 

Many

Above Ave.

 

 

 (8) Plumbing:

 (7) Interior:

 (6) Ceiling:

 (5) Floor Cover:

 (4) Floor Structure:

 (3) Frame:

Block

 

Brick/Stone

 

Poured Conc.

X

Footings

 

 (2) Foundation:

 (1) Excavation/Site Prep:

<<<<< Calculator Cost Computations >>>>>

 Class: C Quality: Average

Stories: 1 Story Height: 14 Perimeter: 100

Overall Building Height: 14

 

Base Rate for Upper Floors = 65.92

 

(10) Heating system: Forced Air Furnace Cost/SqFt: 11.56 100%

Adjusted Square Foot Cost for Upper Floors = 77.48

 

Total Floor Area: 2,100 Base Cost New of Upper Floors = 162,708

 

 Reproduction/Replacement Cost = 162,708

Eff.Age:34 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 46 /100/100/100/46.0

 Total Depreciated Cost = 74,846

 

<<<<< Segregated Cost Computations >>>>>

Costs taken from Segregated Cost Section 4: Garages, Industrials, Warehouses

 Cost # or Height Storys 

Item Desciption Col. Rate SqFt Adj. Adj. Cost

 

 Total Cost New = 0

Architectural Multiplier: 1.07

 

 Reproduction/Replacement Cost = 0

Eff.Age:34 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 46 /100/100/100/46.0

 Total Depreciated Cost = 0

<<<<< Calculations too long. See Valuation printout for complete pricing. >>>>>

 ** ** Calculator Cost Data ** **

Quality: Average 

Heat#1: Forced Air Furnace 100%

Heat#2: Electric, Cable or Baseboard 0%

Ave. SqFt/Story: 2100

Ave. Perimeter: 100

Has Elevators:

 

 *** Basement Info ***

Area:

Perimeter:

Type:

Heat:

 

 * Mezzanine Info *

Area #1:

Type #1:

Area #2:

Type #2:

 

 * Sprinkler Info *

Area:

Type: Average

Low

X

Ave.

 

Above Ave.

 

High

 

Construction Cost

Comments:

Overall Bldg

Height

14

Year Built

Remodeled

1946

 

Depr. Table : 2.25%

Effective Age : 34

Physical %Good: 46

Func. %Good : 100

Economic %Good: 100

Class: C

Floor Area: 2,100

Gross Bldg Area: 30,337

Stories Above Grd: 1

Average Sty Hght : 14

Bsmnt Wall Hght 

Desc. of Bldg/Section: BLDG. 1, SEC. 6

Calculator Occupancy: Warehouses - Storage

*** Information herein deemed reliable but not guaranteed***

Commercial/Industrial Building/Section 6 of 6

Printed on

Parcel Number:

22057119.003L

09/08/2026

PDF reading copy

← View full record