Page 1

RESIDENTIAL NEW CONSTRUCTION PROJECT 

SWORN STATEMENT FOR 

CONTR 

CONTRACTOR OR SUBCONTRACTOR

( 

CTOR'S NAME: Fresh Start Homes Development 

PERIOD FROM: 08/20/2025 TO: 08/01/2026 

fee 

il 

REQUEST NO.:5 

STATE OF MICHIGAN 

) 

) ss 

COUNTY OF Oakland 

) 

1, 

being duly sworn, deposes and says: 

(1) That Fresh Start Homes Development 

is the (contractor)(subcontractor) f

Oakland 

: 

County, Michigan, described as follows: 

(insert legal description of property) 

The following is a statement of each subcontractor and supplier, and laborer for whom payment of wages or fringe benefits and withholdings is due but unpaid, wit

(subcontracted) for performance under the contract with the owner or lessee of the property, and the amounts due to the persons as of the date of this statement a

NAME ADDRESS AND TELEPHONE NUMBER 

Type of 

Total 

Change 

Adjusted 

Amount 

No. 

|OF SUBCONTRATOR, LABORER OR SUPPLIER 

Improvement Furnished] 

~~ Contract 

Orders 

Contract 

Already 

Price 

(+) or (-) 

Price 

Paid 

1 

Permits & Fees 

0.00 

2| Waterford Township 

Building Perm 

0.00 

430.00 

430.00 

430.

3]Oakland County Soil/Erosion 

Soil Erosion Permit 

0.00] 

0.00 

4)Oakland County Soil/Erosion 

Water 

& Sewer Permit 

0.00 

0.00 

5 

Engineering 

0.00 

6]Oakland County Soil/Erosion 

Soil Testing 

0.00 

3 

0.00 

f 

7] 

: 

[Surveying 

; 

0.00 

8] Seiber, Keast Lehner Engineering 

Plot Plans 

0.00 

: 

0.00 

9] Seiber, Keast Lehner Engineering 

__[Stakeout 

& Pin 

0.00] 

0.00 

: 

10) Seiber, Keast Lehner Engineering 

Preliminary Grade for Backfill 

0.00 

0.00 

11} Seiber, Keast Lehner Engineering 

Grade Staking 

500.00 

500.00 

12) Seiber, Keast Lehner Engineering 

Final Grade sas But 

1,600.00] 

1,600.00 

: 

13|Seiber, Keast Lehner Engineering 

Topographic Survey 

0.00 

0.00 

: 

14 

Soil Erosion 

13a 

aea 

B 

0.00 

# 

15|Fresh Start Remodeling 

Silt Fencing 

0.00 

0.00 

: 

16] Fresh Start Remodeling 

[crushed Concrete/Mud Mat 

0.00 

0.00 

] 

17 

: 

[Excavation 

. 

0.00 

; 

18|Already In 

___|Dig Basement/Water & Sewer Line 

0) 

ERE 

0.00) 

: 

19] Fresh Start Remodeling 

[sump Line 

2,000.00 

2,000.00

Page 2

20]Already In 

: 

Backfill 

0.00 

0.00 

21|Fresh Start Remodeling 

Rough Grade & Cut for concrete 

2,500.00 

2,500.00 

1,000

NAME ADDRESS AND TELEPHONE NUMBER 

Total 

Change 

Adjusted 

Amount 

No. 

|OF SUBCONTRATOR, LABORER OR SUPPLIER 

Contract 

Orders 

Contract 

Already 

Price 

(+) or (-) 

Price 

Paid 

22|Fresh Start Remodeling 

Finish Grade 

3,000.00 

3,000.00] 

23|Fresh Start Remodeling 

Fill dirt & material (In/Out) 

0.00 

0.00 

24|Rossi Contracting 

Sewer line 

4,000.00 

3,500.00 

7,500.00 

7,500

25|Rossi Contracting 

Water Tap 

7,000.00 

7,000.00 

7,000

26 

Temp Utilities 

0.00, 

0.00 

27{J & D 

Electrical 

PCM 

/ Temp electric Meter 

750.00) 

750.00 

750

28|J & D Electrical 

600.00 

600.00 

29 

Steel 

0.00 

EL 

0.00 

31 

0.00 

32 

Foundation 

0.00 

33 

0.00 

34|Fresh Start Remodeling - Messina 

Fill Mati-Sand/6A Stone 

2,000.00] 

-93.59 

1,906.41 

1,906

35|Already In 

Walls 

0.00 

0.00 

oe 

0.00 

0.00 

37|Concrete Turner LLC 

Basement slab 

9,210.00 

1,461.00 

7,749.00 

7,749

38| Concrete Turner LLC 

(Garage Slab 

$8.00 Sqft 

6,240.00 

6,240.00 

6,240.

39|Smede Steel 

Stab Mats (re-rodimeshetc, 

500.00) 

590.00 

1,090.00 

1,090.

40 

- 

Framing Lumber 

y 

0.00 

41]84 Lumber w/Truss 

Framing Material (Base) 

49,400.00] 

17,130.91 

32,269.09 

32,269.

42|ABC Supply 

Vinyl Siding 

8,500.00] 

1,025.35 

9,525.35 

43]|George Thoms Construction 

Siding labor 

9,000.00 

2,607.00] 

11,607.00 

44] ABC Carpentry 

Roughing Framer 

18,013.00) 

6,894.00] 

24,807.00 

24,907.

45 

Windows/ Doors 

0.00 

0.00 

46|Home Depot 

Exterior doors 

1,500.00 

-500.00) 

1,000.00 

1,000

47)|MLC 

Windows and labor 

16,500.00 

16,500.00) 

16,500.

48 

Stairs 

0.00 

49 

Garage Stairs 

0.00 

0.00 

50 

|Roofing 

: 

0.00 

51JABC Supply 

Material 

6,900.00 

238.91 

6,661.09) 

6,661.

52] Antonio Construction 

Labor 

3,300.00 

3,300.00 

3,300.

53] 

= 

0.00 

54]Home Depot 

Misc Deck Wood 

0.00 

1,500.00 

1,500.00 

55 

0.00 

0.00 

56 

Brick 

0.00 

0.00

Page 3

57|Fresh Start Remodeling 

Cleaning 

4,500.00 

4,500.00 

2,500.

58] Fresh Start Remodeling 

[Mason sand 

0.00] 

0.00f 

59]|DLK Caulking 

[exterior cau 

2,500.00 

2,500.00, 

60 

Estimating Error/Contingency 

0.00 

0.00 

NAME ADDRESS AND TELEPHONE NUMBER 

Total 

Change 

Adjusted 

Amount 

No. 

|OF SUBCONTRATOR, LABORER OR SUPPLIER 

Contract 

Orders 

Contract 

Already 

Price 

(+) or (-) 

Price 

Paid 

61 

Stone 

0.00 

62 

Material 

0.00 

0.00 

63 

Labor 

0.00] 

0.00 

64 

Limestone 

: 

0.00 

65 

Address Stone 

0.00 

0.00 

66 

Siding/Gutters 

0.00 

67]George Thoms Construction 

Gutters 

4,000.00f 

 -1,490.00 

2,510.00 

68] George Thoms Construction 

Flashing 

100.00] 

100.00 

69 

Shutters 

0.00 

0.00 

70 

0.00 

71 

Fireplace 

0.00 

72 

Prefab Fireplace 

0.00 

0.00 

73 

Prefab Mantle/ Surround 

0.00 

0.00 

74 

|Hvac 

0.00 

75] Mulligan Heating, Inc 

[rougn 

8,750.00] 

-95.00 

8,655.00 

7,155.

76] Mulligan Heating, Inc 

JFumaceucts 

8,750.00 

-95.00 

8,655.00 

7,155.

77|Mulligan Heating, Inc 

AC Condensers & Final 

0.00 

0.00 

78] Mulligan Heating, Inc 

Venting to Exterior 

350.00 

350.00 

350.

79 

Plumbing 

0.00 

80] Scott Brendel Plumbing 

Rough 

4,800.00 

3,850.00, 

8,650.00 

8,650.

81] Scott Brendel Plumbing 

Final 

4,800.00 

3,850.00 

8,650.00 

82] Scott Brendel Plumbing 

|Fixtures -Tub 

1,500.00 

1,500.00 

1,500.

83 

|Etectric 

0.00 

84]J & D 

Electrical 

[Rough 

7,000.00) 

291.00 

7,291.00 

7,291.

85]J & D Electrical 

Final 

7,000.00] 

291.00 

7,291.00 

86]J & D Electrical 

Fixtures 

0.00 

0.00 

87 

0.00 

88 

Prewire Low Volt 

0.00 

89 

Phone (Rough) 

0.00 

0.00 

90 

Cable Rough 

0.00 

0.00 

91 

Alarm 

0.00 

0.00 

92 

Insulation 

0.00 

93] Gale Insultation 

Batt/Blanket /Blown 

5,000.00 

726.00 

5,726.00 

5,726.

Page 4

94 Gale Insultation 

Energy Seal 

1,000.00 

1,000.00] 

1,000

95|Gale Insultation 

Energy Testing 

275.00 

275.00 

96|Accurate Insulation 

Basement Wall Insulation 

0.00 

0.00 

97|Accurate Insulation 

Winter Package 

0.00] 

0.00 

98 

Drywall 

0.00 

99| Clinton Interiors 

[Hang and Finish 

14,000.00 

2,450.00 

16,450.00 

16,450

NAME ADDRESS AND TELEPHONE NUMBER 

Total 

Change 

Adjusted 

Amount

No. 

|OF SUBCONTRATOR, LABORER OR SUPPLIER 

Contract 

Orders 

Contract 

Already 

Price 

(+) or (-) 

Price 

Paid 

100 

Garage Doors 

0.00 

107 Superior Garage Door 

Doors 

each a1 §2200 

4,400.00 

4,400.00 

4,400

102] Superior Garage Door 

Openers 

1@9$550 

550.00 

550.00 

103 

Ceramic Tile 

0.00 

104]Fresh Start Remodeling - Floor & Décor 

Master Bath tle & Labor 

5,000.00 

2,370.14 

2,629.86, 

629

105] 

Mater Bath 

0.00 

106 

Interior Trim 

0.00] 

10784 Lumber finish trim 

Doors and Millwork 

6,500.00 

~1,552.00 

4,948.00 

4,948

708 

0.00 

0.00 

109 

0.00 

0.00 

110 

Trim Carpentry 

0.00 

111] Dominic Badalaenti Trimmer 

Final Draw 

6,000.00 

6,000.00 

6,000

112] Dominic Badalaenti Trimmer 

Stairs 

1,500.00 

1,500.00 

1,500

113] 

Series Extras 

0.00 

0.00 

114 

Cab. & Vanities 

0.00 

115] Dominic Badalaenti Trimmer 

Instaling Cabinets 

1,500.00 

~1,500.00 

0.00 

116|LaF ata Cabinets 

Cabinets STD 

10,500.00 

10,500.00 

70,500

117 

0.00 

118] 

Countertops 

0.00 

719 

Granite 

0.00 

0.00 

120|PMG 

Lamina tops 

3,000.00 

247.00 

3,247.00 

121 

Painting 

0.00 

122] 

Exterior Paint/Stain 

0.00] 

0.00 

123] Painter 

[interior Paintstain-tst draw 

0.00 

0.00 

124] A&V Painting 

Interior Pain/Stin 

2nd Draw 33.50sqt 

9,000.00| 

9,000.00 

9,000.

125] Paint - John Paterson 

Series Extras 

0.00 

0.00 

126 

0.00 

127] 

~ 

|Hardwood 

0.00 

128] Fresh Start Remodeling 

Material 

8,500.00 

-3,449.11 

5,050.89 

125] Fresh Start Remodeling 

Labor 

0.00 

0.00 

131 

Accessories 

0.00

Page 5

132] Golden Glass 

Mirrors 

0.00] 

0.00 

133] Golden Glass 

Shower Doors 

0.00 

0.00 

134] Golden Glass 

Wire Shelving 

0.00 

; 

0.00 

135|Smede Steel 

Door Hardware 

600.00] 

-600.00 

0.00 

137) 

Appliances SS 

0.00 

140] Sergeant Appliances 

[Appliances Package 

0.00 

0.00 

138 

7 

Carpet 

0.00 

139] Carpet Center 

Carpet 

4,000.00( 

4,000.00 

NAME ADDRESS AND TELEPHONE NUMBER 

Total 

Change 

Adjusted 

Amount 

No. 

|OF SUBCONTRATOR, LABORER OR SUPPLIER 

Contract 

Orders 

Contract 

Already 

Price 

(+) or (-) 

Price 

Paid 

139 

Ext Flatwork 

0.00 

140] Fresh Start Remodeling 

Fill Matl-Sand/6A Stone/21 AA Stone} 

4,500.00 

4,500.00 

141] Turner Concrete 

(Concrete - Driveway 

0.00 

0.00 

142 Turner Concrete 

Concrete - Porches & Walks 

4,500.00 

-340.00 

4,160.00 

143| Fresh Start Remodeling 

Interior Cleaning Finish ~~ 1.00/ft 

0.00 

0.00 

144] Fresh Start Remodeling 

|Extra footings for balcony 

0.00 

3,000.00 

3,000.00 

3,000

148] Fresh Start Remodeling 

Toumpster 

2,500.00; 

2,500.00 

1,000

149] Fresh Start Remodeling 

Clean up labor 

3,000.00 

3,000.00 

1,000

150 

Winterizing 

0.00 

151]Consumers Energy 

gas 

- Hook up 

1,500.00 

196.86 

1,696.86 

1,696

152] DTE Energy 

Hook up power 

3,000.00 

-2,337.00 

663.00 

663.

153] Fresh Start Remodeling 

Punch out list 

4,000.00 

4,000.00 

154] Fresh Start Remodeling 

Office paperwork 

4,000.00 

4,000.00 

3,000

155] Fresh Start Remodeling 

Supervision 

50,000.00 

50,000.00 

32,950.

156 Core Insurance Group LLC 

(General liability Insurance 

3,500.00 

3,500.00 

3,500.

157| Fresh Start Remodeling 

[Heater rental for basement 

326.39 

326.39 

326.

158] Fresh Start Remodeling 

[pians for inspector & bluebprints 

85.38 

85.38 

85

159] Fresh Start Remodeling 

Jumper Supplies 

153.00! 

153.00 

153.

160] Fresh Start Remodeling/ SRM Concrete 

[extra footings in basement 

1,500.00 

1,500.00 

1,500.

161|Smede-Son Steel 

[Extra steel for second floor 

1,847.00 

1,847.00 

1,847.

162 Fresh Start Remodeling 

cutting footing in garage 

2,250.00 

2,250.00 

2,250.

163] Smede-Son Steel 

[Extra steel 

21.00 

21.00 

21.

164 Fresh Start Remodeling 

[Window tape for flashing 

274.06] 

274.06 

274.

165] Fresh Start Remodeling 

|Reinspection Fee 

140.00 

140.00 

140.

166] Consumers Energy 

gas usage 

618.82 

618.82 

618.

167|DTE Energy 

energy usage 

89.97 

89.97] 

89.

168 

TOTAL COST 

368,888.00 

5,501 

374,389] 

267,172.

169 

170

Page 6

171 

172) 

173] 

TOTALS 

368,888.00] 

5501.17 

374.389.17| 

267,172.

The contractor has not procured material from, or subcontracted with, any person other than those set forth and owes no money for the improvement other than th

| make this statement as the (contractor) (subcontractor) or as 

of the (contractor) (subcontractor) to represent to the owner or lessee of the property and his or her 

except as specifically set forth in this statement and except for claims of constructions liens by laborers that may be provided under section 109 of the Construction Lien Act, 1980 PA 497,

above-described premises and his or her agents that the above-described property is free from claims of construction liens, or the possibility of construction liens, except asspecifically set

construction liens by laborers which may be provided pursuant to section 109 of the construction lien act, Act No. 497 of the Public Acts of 1980,as amended, being section 570.1109 of t

WARNING TO OWNER: AN OWNER OR LESSEE OF THE ABOVE-DESCRIBED PROPERTY MAY NOT RELY ON THIS SWORN STATEMENT 

TO AVOID THE CLAIM OF SUBCONTRACTOR, SUPPLIER, OR LABORER WHO HAS PROVIDED 

A NOTICE OF FURNISHING OR A LABORER 

WHO MAY PROVIDE A NOTICE OF FURNISHING PURSUANT TO SECTION 109 OF THE CONSTRUCTION LIEN ACT, 1980 PA 497, MCL 570.1109 

TO THE OWNER OR LESSEE IF THE DESIGNEE IS NOT NAMEDOR HAS DIED. ON RECEIPT OF THIS SWORN STATEMENT, THE OWNER OR 

LESSEE, OR THE OWNER'S OR LESSEE'S DESIGNEE, MUST GIVE NOTICE OF ITS RECEIPT, EITHER IN WRITING, BY TELEPHONE, OR PERSONALLY, 

TO EACH SUBCONTRACTOR, SUPPLIER, AND LABORER WHO HAS PROVIDED A NOTICE OF FURNISHING UNDER SECTION 109 OR, IF ANOTICE 

OF FURNISHING IS EXCUSED UNDER SECTION 108 OR 108A, TO EACH SUBCONTRACTOR, SUPPLIER, AND LABORER NAMED IN THE SWORN 

STATEMENT, IF A SUBCONTRACTOR, SUPPLIER, OR LABORER WHO HAS PROVIDED A NOTICE OF FURNISHING OR WHO IS NAMED 

IN THE SWORN STATEMENT MAKES A REQUEST, THE OWNER, LESSEE, OR DESIGNEE SHALL PROVIDE THE REQUESTER A COPY OF THE SWORN 

STATEMENT WITHIN 10 BUSINESS DAYS AFTER RECEVING THE REQUEST. 

WARNING TO DEPONENT: A person who gives a false sworn statement with intent to defraud is subject to criminal penalties as provided