24-004037.pdf
James McCready, Lois McCready, Petitioners V Township Of Tuscarora, Respondent · 24-004037-TT
Text extracted from the reviewed PDF, organized by page. OCR and reading order may contain errors; confirm details in the PDF below.
Page 1
RECEIVED Jim & Lois McCready 0CT 02 2024 5099 Bayou Drive Orange Beach, AL 36561 tele; 231499 8774, 231 590 2760 MICHIGAN TAX TRIBUNAL Email: jpminc14@gmail.com Penny.513@gmail.com 3583 Constance Ave, PO2176,6290 Arthur Indian River , MI 4974 Michigan Tax Tribunal 517 335 9760 Sept 30, 2024 611 W. Ottawa St. PO Box 30232 Lansing, MI 48909 To whom this may concern: RE: 1st SPECAL ASSESSMENT APPEAL DOCS, SENT July 9, 2024 and resent Aug 16, 2024 2" SPECIAL ASSESSMENT, resend requested by LARA on Aug 16, 2024 Phase 1 Special Assessment, Protest hearing appearance June 4, 2024 Tuscarora video available Sewer Project #22-5797 EGLE 1810271 Written Protest & Appeal attached Exhibits A-K: post marked July 9, 2024 Subject: Addendum to Special Assessment, dated Sept 30, 2024 Please be advised of the attached addendum to the subject special assessment appeal based on additional deficiencies and clarifications. 1. The actual Phase 1 construction has started on Sept 16, 2024. 2. Tuscarora Township Supervisor R. Kramer and the board : Clerk J. Reidsma, Trea J.Dillaha, Trustees J. Vance, K. Pearson. a. Have made no attempt to address or answer the deficiencies or presented to them for corrections from Feb.5, 9, 2024 (Letters and docs attached) b. Have made changes to the contracts engrg and contractors in closed meetings with out hearings and EGLE approvals after the drawing approvals of Dec 31, 2023 by Bruce Christian EGLE Proj. Mgr. and his departure from EGLE. le: 200ft of underground gravity sewer on 595.5 flood plan elev. area on park walkway less than 50 ft. from the Indian River Have not clarified the location of a 3000 gal PS200 sewerage lift station, presently located in a Cheboygan permitted residential drive. Have not certified actual residential costs per REI and have not included many equipment and service added costs. Have included many itemized costs in Phase 1 assessment that are for Phase 1, 3 and general public use. e. Just and equitable REI, residential assessment sharing. le: Exhibit B 5. APPEAL DOCS clarification from Matts contract bid docs. (23) REI individual pump station connections direct to house @ $21,695, S 498,985 ( included in contract, no cost to REI) (180) REI connection to property line by REI owner ( $5000-530,000 connection costs, OUT of POCKET to REI owner) f. Over 50 REI owners with Mich Health Dept sanitary mounds systems with 5-15 year use approval., most USA sewer systems apply a time frame connection. 3. The Appointed (not elected) Tuscarora Township Supervisor R. Kramer and (4) balance seated members will be leaving Nov. 20, 2024 the Supervisor and complete board will be replaced. The main focus of the new board will be the Sewer Project: an
Page 2
JPM, Inc: - Innovative Loading Systems (ILS) Coast to Coast Charters, Licensed USCG Captain, 100 ton A MICHIGAN GREEN is GOLD Co. Design and manufacture of innovative energy efficient and ecologically sound Truck, Rail, Barge, and Vessel Dust Free high speed commodity loading. Ecological Commodity Project and Process Management. Marcgemert Indian River Office 231 238 9631 Harbor Springs Office Sales, Engineering, Vessel Charters Main Office : Sales, Engineering PO 2176, 3583 Constance 18 W. Brutus Rd Indian River, MI 49749 Harbor Springs, Ml 49740 Feb 05, 2024 Bob Kramer, Supv. Tuscarora Twp tele: 231 238 7088 Email: supervisor@tuscaroratwp.com RE: Tuscarora Sewer #22-5797 EGLE 1810271 Hi Bob, In reply to your letter of Nov 16,2023 requesting me to “quit contacting” PEI and Aaron Nordman. | am again requesting you as Chairman of the pending sewer project and associates to review the following subjects in your scheduled Feb 06, 2023 "Sewer progress meeting” based on recent Dec 31, 2023 PEI drawing and engineering changes submitted to EGLE by PEI for permitting. (attached) after Nov 16, 2023, The three (3) A.B.&C. subjects that were outlined in my letter of Nov 06, 2023 were (A) relocation and now requested elimination of lift station PS200 (B) Individual underground drilling GP SSFM stations @ tag #135,136 connecting to the 4” SSFM on Constance Ave. eliminating all gravity SAN and CCRC AASHTO certified road work. No easements required (C) Individual underground drilling GP SSFM stations @ tag # 138 -146 connecting to The 4” SSFM on Arthur Street eliminating all gravity SAN and CCRC AASHTO certified road work. No easements required The PS200 pump lift station has been moved and does not conform to the 100 ft. EGLE isolation and is still located in the the ingess DRIVE LOCATON of 6290 Arthur as noted on the latest 12-31-2023 drawings that | have been submitted to EGLE and Permitted Site Plan, zoning permit PZ23-0012, SP-01. The optional location of the PS200 pump lift station @ Lot 5, Block 1 & ROW ( 100 ft.) was thought to be better however the limited ROW space between Arthur asphalt and property line is only 2/3 ft. from the existing Arthur asphalt roadway. (attached drawing).
Page 3
JPM, Inc: - Innovative Loading Systems (ILS) Coast to Coast Charters, Licensed USCG Captain, 100 ton A MICHIGAN GREEN is GOLD Co. Design and manufacture of innovative energy efficient and ecologically sound Truck, Rail, Barge, and Vessel Dust Free high speed commodity loading. Ecological Commodity Project and Process Mana Indian River Office 231 238 9631 Harbor Springs Office Sales, Engineering, Vessel Charters Main Office : Sales, Engineering PO 2176, 3583 Constance 18 W. Brutus Rd Indian River, MI 49749 Harbor Springs, MI 49740 gement Management. Feb 09, 2024 Bob Kramer, Supv. Tuscarora Twp tele: 231 238 7088 Email: supervisor@tuscaroratwp.com RE: Tuscarora Sewer Project #22-5797, EGLE 1810271 Hi Bob, | am in receipt of your email Feb 09 answer to my recent Feb 05 letter requesting system review for the Feb 6 sewer meeting. Sorry for such a small short limited answer for such a large cost saving request. These requests were sent to you as the Director for corrective answers to the deficiencies in the proposed system. These requests originating in letters and documents from Feb. 15,18, 2023, Nov.6,2023 with many corrective measures to the system at the C321/C303 areas. | am again requesting you as Chairman of the pending sewer project and associates to review the following subjects in the Feb 05, 2024 letter and documents. We being a 30 year residents of Tuscarora Twp my interests are in a sound, economical engineered system specifically the (22) residence of the Constance Park Plat. My residency in Orange Beach prevents me from meetings other than the visuals and lacking “3 minute” comments. | again request the technical review with Aaron Nordman and answers to items A,B C. The three (3) A.B.&C. subjects that were outlined in my letter of Nov 06, 2023 were. (A) relocation and now requested elimination of lift station PS200 (B) Individual underground drilling GP SSFM stations @ tag #135,136 connecting to the 4” SSFM on Constance Ave. eliminating all gravity SAN and CCRC AASHTO certified road work. No easements required Review of relocated SAN within 10ft @ Martin Canal RE: dwg C321 (C) Individual underground drilling GP SSFM stations @ tag # 138 -146 connecting to The 4" SSFM on Arthur Street eliminating all gravity SAN and CCRC AASHTO certified road work. No easements required
Page 4
JPM, Inc: - Innovative Loading Systems (ILS) Coast to Coast Charters, Licensed USCG Captain, 100 ton A MICHIGAN GREEN is GOLD Co. Design and manufacture of innovative energy efficient and ecologically sound Truck, Rail, Barge, and Vessel Dust Free high speed commodity loading. Ecological Commodity Project and Process Management Management. Indian River Office 231 238 9631 Harbor Springs Office range Beach Office 23 Sales, Engineering, Vessel Charters Main Office : Sales, Engineering Si Vi PO 2176, 3583 Constance 18 W. Brutus Rd Indian River, MI 49749 Harbor Springs, MI 49740 Nov 6, 2023 Aaron Nordman tele: 231 547 2121 RE: Tuscarora Sewer #22-5797 EGLE 1810271 email: anordman@performanceeng.com Hi Aaron The GDP No.1810271 Permit took effect Nov 1, 2023. In a brief telcon with Barry Christian, Justan Pung/EGLE the150 day review period for Phase 1 & 2 takes effect Nov 1 and Barry Christian is in the process of reviewing your engineering permit drawings for Phase 1 & 2. I am hoping that design parameters will be considered based on our recent reviews and discussions related to PS200 and underground drilling. I am in my Orange Beach office and limited to email, attachments and reliable computer Service, however | would like to add continued comments to your project. Comments and review are based on receipt of drawings of May 19,2023, permit submittal dated 5/24,2023. | am requesting from our previous review and design parameter discussions related to: A.The relocation of PS200 lift station location. B. Possibile relocation of serv tag # 132,134 &135 (Constance Ave.) to individual GP SSFM underground drilling service across the rear property of house's # 3617, 3597 & 3593 ( Exhibit | & easements agreements have been reviewed and pending ) to Arthur St. to the SSFM C. Review and comments of an addition of individual GP SSFM user tag # 136 to 142 (Arthur St). individual GP SSFM underground drilling service to Poplar St. Item A. The PS200 location | am using is based on Dwgs dated 5/19/23 and 5/24 permit submittal drawings.
Page 5
Tuscarora Sewer cond page 2 Nov 06, 2023 Item B. Serv tags #132,134 &135 on Constance Ave as noted on Exhibit 11 & 11-A with individual GP-SSFM to Arthur St SSFM would eliminate all SAN Trenching and road work on Constance that is not in compliance with CCRC road specifications and requires storm drain road erosion control and is restricted by an actual 20 ft. ROW at Witt that has been a road ingress/egress/problem in the past with possible one way or abandonment. Item C. Considering the addition of another seven individual GP SSFM underground drilling user tags (#136 to 142) on the Arthur St SSFM could eliminate all the SAN Trenching and road work on Arthur St. This new developed cost effective underground drilling system would also eliminate the complex SAN systems on Constance and Arthur but most importantly would remove the PS200 lift station that is in a very sensitive ecological area. Awaiting your review, comments and response Regards, Pen and Jim McCready Jim McCready, Pres. JPM Inc./ILS Xc: Barry Christian. Christianb2@michigan.com
Page 6
SPATE OF MICHIGAN GRETCHEN WHITMER DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS MARLON |. BROWN, DPA GOVERNOR FANSING DIRECTOR PROPERTY TAY APPEAL PETITION FORM + #, SPECIAL ASSESSMENT ed rte? Lees BRsER oN) SU FIs Ermer 0 Ee — Section £: Pefifionar’s Contact information Gres # feo i= (Fw Ji 27 Ps ve Ty Beltre (Mo. Siveet, Pu. Box or Rival Route) | Semen 4 ERE rE 27 wo Zee i "Fp Z3/- en a Emel Ridrens (do roi enior less yon VEnE TT to seul of oorreapRiansa Va Smal} LL IOTNC) FD Er CON) Section 2: Petitioner's Attormey/Authorized Representative’s Contact information i ! Cimon Nome GE am H 1 Sires Ste. Thre, PO. Bmm Beri Nae) [ieres swe Sain ZF Coder I free mey ——— TT FesNambor Emad Relies Som rl erm vis ps eer HES 3 fr sem afl crenenmennder rey via arom Section 3: Sublet Properly Information Howmany | Elver S Thoa my igor sms ”] pos, sae amelie peel farm fo Fineien cogueding ung cunliguoes genesis. Pra Erp, yous} le sepxiale appemds fur tach non-sefigmes oF ranradjoiing parcel or you will be defaulted. Properly Address (No. Saeek, Ofy, ST. 2 Emmeple, Bek ost prepecty's address) | B58 2B CONSTANCE 5 :
Page 7
Fae OF MICHIGAN
GRETCHEN WHITMER
MARLON i. BROWN, DPA
PAR
DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS
NL BROW
©
_Seciton
4: Explain the Reason for this Appeal
ia
SEE ATA fe
CoE
4 Tim, ARE AOSF ERIM
ALY F Fe DK
Bex Vez
AL. AT EIEST
2 FEZ ey
PER, A JLT 2025
#
{rt
crib ad on
an em ER asin
rai marines
am ts en Samet TA
Section
5: Jisdiclional issues
.
Ps
| yes pvChes tes opeciol amcsment a Une ering ek 00 confirms the speciot sssesament ros
| Yes [EIS
Yen, vind wes the dads of Se Sealey held bs noses he speeid noessamend vol?
| JOINE
oF, 2224 Ph Sz cael vos |
Hato, splat
AL,
SURE
FUT
SN
Fee information
Afus of$100.001s required fu tho fing ofa Special Assasermant Appeal Y=) 4 Fo
ESHD))
Foy
Authorid
5 Signatire;
1Page 8
Jim and Lois McCready 3583 Constance Ave, PO2176 Indian River , MI 4974 Michigan Tax Tri PO Box 30232 Lansing, MI 4890