Record Card (56).pdf
D&D Investments Of Saginaw LLC Petitioner V Township Of Buena Vista Respondent · 26-000771-TT
Text extracted from the reviewed PDF, organized by page. OCR and reading order may contain errors; confirm details in the PDF below.
Page 1
Printed on 08/11/2026 Parcel Number: 10-12-5-04-3001-008 Jurisdiction: BUENA VISTA CHARTER TOWNSH County: Saginaw Grantor Grantee Sale Price Sale Date Inst. Type Terms of Sale Liber & Page Verified By Prcnt. Trans. SAGINAW AUTO RECYCLERS LL D&D INVESTMENTS OF SAGINA 100,000 10/10/2025 WD 03-ARM'S LENGTH 2025025188 PROPERTY TRANSFER 100 ALL-KAR INC SAGINAW AUTO RECYCLERS LL 425,000 02/06/2025 WD 16-LC PAYOFF 2025002579 DEED ALL-KAR INC SAGINAW AUTO RECYCLERS LL 0 11/22/2006 MLC 33-TO BE DETERMINED 2413: 0899 NOT VERIFIED EVERETT, MARK E ALL-KAR INC 0 04/17/2006 OTH 04-BUYERS INTEREST IN A 2392: 1942 NOT VERIFIED Property Address 3245 HACK RD Owner's Name/Address D&D INVESTMENTS OF SAGINAW LLC 3883 BARRINGTON DR SAGINAW, MI 48603 Tax Description COM AT S 1/4 CORN OF SEC TH W 801.32 FT TO POB TH N03DEG W 239.06 FT TH E 151.47 FT TH N03DEG W 1511.95 FT TH N88DEG W 356.47 FT TH S03DEG E 1751.01 FT TH E 205 FT TO POB 13.46 ACRES SEC 4 T12N R5E ***NEW # SPLIT FROM PARENT 3001-000 1/31/06 Comments/Influences NEW# PER 1/31/06 SPLIT Class: INDUSTRIAL-IMPROV Zoning: M-1 I Building Permit(s) Date Number Status School: SAGINAW (BUENA VISTA DEBT) Electrical 12/06/2022 PE220110 P.R.E. 0% MAP #: 2026 Est TCV 178,342 TCV/TFA: 77.41 X Improved Vacant Public Improvements Dirt Road Gravel Road Paved Road Storm Sewer Sidewalk Water Sewer Electric Gas Curb Street Lights Standard Utilities Underground Utils. Topography of Site Level Rolling Low High Landscaped Swamp Wooded Pond Waterfront Ravine Wetland Flood Plain Who When What Land Value Estimates for Land Table IND04.IND04.COMM-IND LAND IN SEC 04&05 * Factors * Description Frontage Depth Front Depth Rate %Adj. Reason Value IND-COMM LAND SEC4&5 13.460 Acres 11,541 100.000 155,342 13.46 Total Acres Total Est. Land Value = 155,342 Work Description for Permit PE220110, Issued 12/06/2022: Hook up Temp service and temp office.3249 Hack Year Land Value Building Value Assessed Value Board of Review Tribunal/ Other Taxable Value 2026 77,700 11,500 89,200 89,200U 2025 70,600 10,900 81,500 56,705C 2024 45,400 9,600 55,000 55,000S 2023 45,400 10,600 56,000 56,000S
Page 2
Commercial/Industrial Building/Section 1 of 2 Parcel Number: 10-12-5-04-3001-008 Printed on 08/11/2026 Desc. of Bldg/Section Calculator Occupancy Sheds - Equipment 3 Wall Shed Class: D,Pole Floor Area: 1,152 Gross Bldg Area: 2,304 Stories Above Grd: 1 Average Sty Hght: 12 Bsmnt Wall Hght: 0 Depr. Table : 4% Effective Age : 10 Physical %Good : 66 Func. %Good : 100 Economic %Good : 100 0 Year Built 0 Remodeled 0 Overall Bldg Height Comments: Construction Cost Fa High Fa Above Ave. Fa Ave. Fa Low ** ** Calculator Cost Data ** ** Quality: Average Heat#1: No Heating or Cooling 0% Heat#2: No Heating or Cooling 0% Ave. SqFt/Story: 1152 Ave. Perimeter: 104 Has Elevators: False *** Basement Info *** Area: Perimeter: Type: Heat: Hot Water, Radiant Floor * Mezzanine Info * Area #1: Type #1: Area #2: Type #2: * Sprinkler Info * Area: Type: Average Cost Estimates for Commercial/Industrial Building/Section: 1 Built 0 Costs are taken from the Sheds - Equipment 3 Wall Shed cost schedules. <<<<< Calculator Cost Computations >>>>> Class: D,Pole Quality: Average Stories: 1 Story Height: 12 Perimeter: 104 Base Rate for Upper Floors = 27.50 Adjusted Square Foot Cost for Upper Floors = 27.50 Total Floor Area: 1,152 Base Cost New of Upper Floors = 31,680 Reproduction/Replacement Cost = 31,680 Eff.Age:10 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 66 /100/100/100/66.0 Total Depreciated Cost = 20,909 ECF (INDUSTRIALS IN SEC 4 & 5) 0.550 => TCV of Bldg: 1 = 11,500 Replacement Cost/Floor Area= 27.50 Est. TCV/Floor Area= 9.98 (1) Excavation/Site Prep: (2) Foundation: Footings F Poured Conc Fa Brick/Stone Fa Block (3) Frame: (4) Floor Structure: (5) Floor Cover: (6) Ceiling: (7) Interior: (8) Plumbing: Fal Many Fal Average Fal Few Fal Above Ave. Fal Typical Fal None Total Fixtures Urinals 3-Piece Baths Wash Bowls 2-Piece Baths Water Heaters Shower Stalls Wash Fountains Toilets Water Softeners (9) Sprinklers: (10) Heating and Cooling: F Gas Fa Coal Fa Hand Fired F Oil Fa Stoker Fa Boiler (11) Electric and Lighting: Outlets: Fixtures: Fa Few Fal Few Fa Average Fal Average Fa Many Fal Many Fa Unfinished Fal Unfinished Fa Typical Fal Typical Fa Flex Conduit Fal Incandescent Fa Rigid Conduit Fal Fluorescent Fa Armored Cable Fal Mercury Fa Non-Metalic Fal Sodium Vapor Fa Bus Duct Fal Transformer (13) Roof Structure: Slope= (14) Roof Cover: (39) Miscellaneous: (40) Exterior Wall: Thickness Bsmnt Insul. *** Information herein deemed reliable but not guaranteed***
Page 3
Parcel Number: 10-12-5-04-3001-008 Commercial/Industrial Building/Section 1 of 2 Printed on 08/11/2026 *** Information herein deemed reliable but not guaranteed***
Page 4
Commercial/Industrial Building/Section 2 of 2 Parcel Number: 10-12-5-04-3001-008 Printed on 08/11/2026 Desc. of Bldg/Section Calculator Occupancy Sheds - Equipment 3 Wall Shed Class: D,Pole Floor Area: 1,152 Gross Bldg Area: 2,304 Stories Above Grd: 1 Average Sty Hght: 12 Bsmnt Wall Hght: 0 Depr. Table : 4% Effective Age : 10 Physical %Good : 66 Func. %Good : 100 Economic %Good : 100 0 Year Built 0 Remodeled 0 Overall Bldg Height Comments: Construction Cost Fa High Fa Above Ave. Fa Ave. Fa Low ** ** Calculator Cost Data ** ** Quality: Average Heat#1: No Heating or Cooling 0% Heat#2: No Heating or Cooling 0% Ave. SqFt/Story: 1152 Ave. Perimeter: 104 Has Elevators: False *** Basement Info *** Area: Perimeter: Type: Heat: Hot Water, Radiant Floor * Mezzanine Info * Area #1: Type #1: Area #2: Type #2: * Sprinkler Info * Area: Type: Average Cost Estimates for Commercial/Industrial Building/Section: 2 Built 0 Costs are taken from the Sheds - Equipment 3 Wall Shed cost schedules. <<<<< Calculator Cost Computations >>>>> Class: D,Pole Quality: Average Stories: 1 Story Height: 12 Perimeter: 104 Base Rate for Upper Floors = 27.50 Adjusted Square Foot Cost for Upper Floors = 27.50 Total Floor Area: 1,152 Base Cost New of Upper Floors = 31,680 Reproduction/Replacement Cost = 31,680 Eff.Age:10 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 66 /100/100/100/66.0 Total Depreciated Cost = 20,909 ECF (INDUSTRIALS IN SEC 4 & 5) 0.550 => TCV of Bldg: 2 = 11,500 Replacement Cost/Floor Area= 27.50 Est. TCV/Floor Area= 9.98 (1) Excavation/Site Prep: (2) Foundation: Footings F Poured Conc Fa Brick/Stone Fa Block (3) Frame: (4) Floor Structure: (5) Floor Cover: (6) Ceiling: (7) Interior: (8) Plumbing: Fal Many Fal Average Fal Few Fal Above Ave. Fal Typical Fal None Total Fixtures Urinals 3-Piece Baths Wash Bowls 2-Piece Baths Water Heaters Shower Stalls Wash Fountains Toilets Water Softeners (9) Sprinklers: (10) Heating and Cooling: F Gas Fa Coal Fa Hand Fired F Oil Fa Stoker Fa Boiler (11) Electric and Lighting: Outlets: Fixtures: Fa Few Fal Few Fa Average Fal Average Fa Many Fal Many Fa Unfinished Fal Unfinished Fa Typical Fal Typical Fa Flex Conduit Fal Incandescent Fa Rigid Conduit Fal Fluorescent Fa Armored Cable Fal Mercury Fa Non-Metalic Fal Sodium Vapor Fa Bus Duct Fal Transformer (13) Roof Structure: Slope= (14) Roof Cover: (39) Miscellaneous: (40) Exterior Wall: Thickness Bsmnt Insul. *** Information herein deemed reliable but not guaranteed***