Full record / Record Card 1301 N Eaton.pdf

Record Card 1301 N Eaton.pdf

The Huntington National Bank, Petitioner V City Of Albion, Respondent · 25-001793-TT

← View full record

Text extracted from the reviewed PDF, organized by page. OCR and reading order may contain errors; confirm details in the PDF below.

Page 1

Printed on

07/21/2025

Parcel Number:

51-005-812-00

Jurisdiction:

CITY OF ALBION

County: Calhoun

Grantor

Grantee

Sale

Price 

Sale

Date

Inst.

Type

Terms of Sale

Liber

& Page

Verified

By

Prcnt.

Trans.

GREAT LAKES NATIONAL BANK CHEMICAL BANK SOUTH

400,000

11/20/1998

WD

03-ARM'S LENGTH

2091/493

PROPERTY TRANSFER

100

Property Address

1301 N EATON ST

Owner's Name/Address

CHEMICAL BANK SOUTH

FACILITY DEPARTMENT

PO BOX 610287

525 WATER STREET

PORT HURON, MI 48061

Tax Description

ALBION CITY, ASSESSORS PLAT OF HARTWELL

ADDITION LOTS 112 -113 -114 & 115. (1301

N EATON ST)

Comments/Influences

2000 COMPLETED 120 SF ADDITION

11:34:34 06 FEB 1998 - SAMSADD OMITTED

OUTDOOR LIGHTING08:55:29 15 MAY 1996 -

SAMSNO CHANGE PER 95 BOR15:21:26 13 JUL

1994 - SAMS13:56:28 28 JUL 1993 -

SAMS10:04:57 16 NOV 1992 - SAMS

Class: COMMERCIAL-IMPROV Zoning: MU

Building Permit(s)

Date

Number

Status

School: MARSHALL SD (ALBION DEBT)

P.R.E. 0% 

MAP#: 

2025 Est TCV 352,617 TCV/TFA: 161.90

X Improved

Vacant

Public

Improvements

Dirt Road

Gravel Road

X Paved Road

X Storm Sewer

Sidewalk

X Water

X Sewer

X Electric

X Gas

X Curb

Street Lights

Standard Utilities

Underground Utils.

Topography of 

Site

Level

Rolling

Low

High

Landscaped

Swamp

Wooded

Pond

Waterfront

Ravine

Wetland

Flood Plain

Who When What

DEB 05/07/1996

INSPECTED

DEB 10/14/1996

DATA ENTER

Land Value Estimates for Land Table 102.102-COMMERCIAL OTHER

 * Factors *

Description Frontage Depth Front Depth Rate %Adj. Reason Value

 MINIMUM SITE 264.00 0.00 0.7169 0.0000 0 0 NOT USED FOR VA 00

VALUE BY LOCATION UP TO.7 AVG 0.70 Acres 80,000 100 

VALUE BY LOCATION 0.7 - 2 LOW 0.30 Acres 13,000 100 

264 Actual Front Feet, 1.00 Total Acres Total Est. Land Value = 59,900

Land Improvement Cost Estimates

Description Rate Size % Good Cash Value

D/W/P: Asphalt Paving 3.21 30000 40 38,520

D/W/P: 5in Ren. Conc. 9.26 1704 80 12,623

Unit in Place Item(s)

Description Rate Size % Good Cash Value

 CONCRETE 3-1/2" 3.04 440 55 736

Commercial Local Cost Land Improvements

Description Rate Size % Good Arch Mult Cash Valu

 SPOTLIGHTS 185.00 4 57 108 45

 METAL POLES,PER LF 55.00 40 57 108 1,36

 Total Estimated Land Improvements True Cash Value = 53,702

Year

Land

Value 

Building

Value 

Assessed

Value 

Board of

Review 

Tribunal/

Other 

Taxable

Value 

2025

30,000

146,300

176,300

158,052C

2024

30,000

123,300

153,300

153,300S

2023

25,200

152,300

177,500

168,499C

2022

25,200

152,400

177,600

160,476C

Page 2

Commercial/Industrial Building/Section 1 of 1

Parcel Number:

51-005-812-00

Printed on

07/21/2025

Desc. of Bldg/Section

Calculator Occupancy

Banks - Central

Class: C

Floor Area: 2,178

Gross Bldg Area: 2,178

Stories Above Grd: 1

Average Sty Hght: 9

Bsmnt Wall Hght: 8

Depr. Table : 2%

Effective Age : 32

Physical %Good : 52

Func. %Good : 100

Economic %Good : 100

1974 Year Built

1998 Remodeled

15 Overall Bldg

Height

Comments:

Construction Cost

Fa High

Fa Above Ave.

Fa Ave.

Fa

Low

** ** Calculator Cost Data ** **

Quality: Good 

Heat#1: Package Heating & Cooling 100

Heat#2: Package Heating & Cooling 0%

Ave. SqFt/Story: 2178

Ave. Perimeter: 200

Has Elevators: False

*** Basement Info ***

Area:

Perimeter: 180

Type:

Heat: Forced Air Furnace

* Mezzanine Info *

Area #1:

Type #1: Office

Area #2:

Type #2: Office

* Sprinkler Info *

Area:

Type: Average

Cost Estimates for Commercial/Industrial Building/Section: 1 Built 1974

 

Costs are taken from the Banks - Central cost schedules.

<<<<< Calculator Cost Computations >>>>>

 Class: C Quality: Good

Stories: 1 Story Height: 9 Perimeter: 200

Overall Building Height: 15

 

Base Rate for Upper Floors = 262.62

(10) Heating system: Package Heating & Cooling Cost/SqFt: 26.35 100%

Adjusted Square Foot Cost for Upper Floors = 288.97

 

Total Floor Area: 2,178 Base Cost New of Upper Floors = 629,377

 

 Reproduction/Replacement Cost = 629,377

Eff.Age:32 Phy.%Good/Abnr.Phy./Func./Econ./Overall %Good: 52 /100/100/100/52.0

 Total Depreciated Cost = 327,276

 

Lump Sum Items Rate Quantity Arch %Good Depr.Cost

 DRIVE-UP WINDOW 9277.26 1 1.00 48 4,453

 PNEUMATIC UNITS 24473.78 3 1.00 48 35,242

 CONC COVERED PORCH 10.42 153 1.00 48 765

 CANOPY 22.25 975 1.00 48 10,413

 CANOPY 22.25 689 1.00 48 7,359

 

ECF (201-COMMERCIAL OTHER) 0.620 => TCV of Bldg: 1 = 239,015

 Replacement Cost/Floor Area= 288.97 Est. TCV/Floor Area= 109.74

 (1) Excavation/Site Prep:

 (2) Foundation:

Footings

F Poured Conc

Fa Brick/Stone Fa Block

 (3) Frame:

 (4) Floor Structure:

 (5) Floor Cover:

 (6) Ceiling:

 (7) Interior:

 (8) Plumbing:

Fal Many

Fal Average

Fal Few

Fal Above Ave. Fal Typical

Fal None

Total Fixtures

Urinals

3-Piece Baths

Wash Bowls

2-Piece Baths

Water Heaters

Shower Stalls

Wash Fountains

Toilets

Water Softeners

 (9) Sprinklers:

 (10) Heating and Cooling:

F Gas

Fa Coal

Fa Hand Fired

F Oil

Fa Stoker

Fa Boiler

 (11) Electric and Lighting:

Outlets:

Fixtures:

Fa Few

Fal Few

Fa Average

Fal Average

Fa Many

Fal Many

Fa Unfinished

Fal Unfinished

Fa Typical

Fal Typical

Fa Flex Conduit

Fal Incandescent

Fa Rigid Conduit

Fal Fluorescent

Fa Armored Cable

Fal Mercury

Fa Non-Metalic

Fal Sodium Vapor

Fa Bus Duct

Fal Transformer

 (13) Roof Structure:

Slope=

 (14) Roof Cover:

 (39) Miscellaneous:

 (40) Exterior Wall:

Thickness

Bsmnt Insul.

*** Information herein deemed reliable but not guaranteed***

Page 3

Parcel Number:

51-005-812-00

Commercial/Industrial Building/Section 1 of 1

Printed on

07/21/2025

*** Information herein deemed reliable but not guaranteed***

PDF reading copy

← View full record