BORROWER'S PROJECT BUDGET & PAY APPLICATION COVER SHEET Loan Name: Project Address: TOTALS 107 units 16,954,547.09 Building U (4 units) 429,229.79 Building V (4 units) 431,143.07 Building N (4 units) 400,145.06 Building S (5 units) Building R (6 units) 586,533.69 485,598.24 Building D (6 units) 599,854.43 417,805.35 Initial Improvements Building C (4 units) Building B (5 units) 532,991.39 Redwood Holt Cedar St. MI P3 LLC Holt, MI Building A (6 units) 5,847,501.97 FUNDING USES Description of Work 633,829.25 Value Scheduled Building L (4 units) 392,374.88 Building E (4 units) Building T (5 units) 527,975.44 Building H (5 units) Building F (4 units) 437,869.30 407,792.78 Building K (5 units) Building P (4 units) 409,132.62 Building Q (4 units) 413,370.36 Building M (4 units) 403,956.61 372,686.54 491,523.91 631,037.99 Building J (4 units) 494,936.22 Building G (6 units) Building W (4 units) 424,094.23 Building X (2 units) 220,340.25 Building Y (4 units) 420,328.89 Building Z (5 units) 542,494.83
Page 2
10/6/2025 A B G ItemNo. Description of Work Soft Costs Total Completed to Date Soft Cost: 1-101-1001-610010-5 Land Acquisition $682,112.50 Subtotal $682,112.50 1-102-1002-620040-5 Surveyor Construction Staking $106,895.00 1-102-1002-620050-5 Landscape Architect $5,540.00 1-102-1002-620060-5 Irrigation Designer $1,800.00 1-102-1002-620070-5 Environmental Consultant $2,300.00 1-102-1002-620205-5 Construction Material Testing $32,373.04 1-102-1002-620210-5 Other Consultant $3,341.25 1-102-1002-620010-5 Architect $47,750.20 1-102-1002-620030-5 Surveyor Alta /As Built $6,925.00 1-102-1002-620080-5 Geotechnical Engineer $20,606.93 1-102-1002-620170-5 FHA Consultant $140.00 1-102-1002-620190-5 Legal $74,311.46 1-102-1002-620020-5 Civil Engineer $81,392.55 1-102-1002-620180-5 Title Insurance $42,026.44 1-102-1002-620120-5 Wetland Consultant $6,382.86 1-102-1002-620130-5 Traffic Consultant $2,000.00 Subtotal $ 433,784.73 1-106-1006-660030-5 Gas Connection Fees $32,905.50 1-106-1006-660040-5 Electric Connections Fees $23,082.29 1-106-1006-660060-5 Water Meters $29,610.00 1-106-1006-660020-5 Water Connection Fees $205,780.00 1-106-1006-660010-5 Sewer Connection Fees $300,000.00 Subtotal $ 591,377.79 General Requirements: 2-201-2001-019210-5 General Labor $31,469.73 2-201-2001-013110-5 Credit Card Expense $7,326.75 2-201-2001-015160-5 Sanitary Facilities $5,217.00 Sub Group: 201 - General Requirements Sub Group: 106 - Utilities Redwood Holt Cedar Street MI P3 Sub Group: 101 - Land Sub Group: 102 - Consultants
Page 3
2-201-2001-015170-5 Equipment Rentals, Fuel, Maintenance $137,929.52 2-201-2001-013120-5 Roof Anchors/Foundation Membrane $165.30 Subtotal $ 182,108.30 301 Site Civil $3,166,959.58 3-301-3101-015513-1 Temporary Access Road $5,257.50 3-301-3101-017113-1 Mobilization & Demobilization $5,600.00 3-301-3131-311000-1 Clearing & Grubbing $81,547.85 3-301-3131-312000-1 Earthwork $241,724.51 3-301-3131-312219-1 Finish Site Grading & Topsoil Placement $257,553.65 3-301-3131-312323-1 Soil Import & Export $375,806.06 3-301-3131-312500-1 Erosion Control & Temporary Stabilization $170,016.22 3-301-3132-323200-1 Structural Retaining Walls $103,894.05 3-301-3133-331000-1 Water Utilities $580,421.55 3-301-3133-331211-1 Water Laterals, Meters & Taps $4,614.00 3-301-3133-333000-1 Sanitary Sewerage Utilities $460,952.62 3-301-3133-333923-1 Sanitary Laterals $8,306.25 3-301-3133-334000-1 Storm Drainage Systems $677,779.12 3-301-3133-334613-1 Downspout Collection $163,310.00 3-301-3133-337000-1 Electric Utilities & Sleeving $30,176.20 302 Site Paving $551,070.09 3-302-3232-321100-1 Subgrade Preparation & Base Courses $46,638.50 3-302-3232-321120-1 Subgrade Modifications & Treatments $73,562.10 3-302-3232-321300-1 Rigid Concrete Road Paving $369,474.73 3-302-3232-321623-1 Common Area Sidewalks $60,394.76 3-302-3232-321723-1 Pavement Markings $1,000.00 303 Off Site Improvements $3,137.64 3-303-3332-329001-1 Off Site Landscaping $3,137.64 304 Irrigation & Common Area Landscaping $235,131.34 3-304-3432-328000-1 Irrigation System $235,131.34 305 Site Amenities $1,820.00 3-305-3533-337119-1 Amenities Electrical $1,820.00 Grand Totals $5,847,501.97 Cost Group: 3 - Land Development
Page 4
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $633,829.25 4103 Concrete $85,179.35 4-401-4103-033100-1 Bldg A Foundation $77,913.63 4-401-4103-033150-1 Bldg A Slab on Grade $7,265.72 4104 Masonry $8,256.07 4-401-4104-044313-1 Bldg A Stone Masonry Veneer $8,256.07 4106 Wood & Plastics $135,970.26 4-401-4106-062000-2 Bldg A Interior Finish Carpentry Labor $6,700.00 4-401-4106-064000-3 Bldg A Interior Trim & Interior Doors Material $12,466.00 4-401-4106-061000-3 Bldg A Rough Framing Materials $75,607.98 4-401-4106-061010-2 Bldg A Rough Framing Labor $26,180.00 4-401-4106-064100-1 Bldg A Cabinets $15,016.28 4107 Thermal & Moisture Protection $71,027.58 4-401-4107-073113-3 Bldg A Roofing Material $18,700.66 4-401-4107-074634-2 Bldg A Vinyl Siding & Exterior Trim Labor $21,000.00 4-401-4107-072120-1 Bldg A Insulation Walls $11,226.92 4-401-4107-073100-1 Bldg A Roofing Labor $6,390.00 4-401-4107-072126-1 Bldg A Insulation Ceiling $10,710.00 4-401-4107-077123-1 Bldg A Gutters & Downspouts $3,000.00 4126 Electrical $62,256.41 4-401-4126-265000-1 Bldg A Electrical Fixtures $10,540.57 4-401-4126-260500-1 Bldg A Electrical Service Equipment $5,535.84 4-401-4126-260520-1 Bldg A Electrical Finish $13,660.50 4-401-4126-260510-1 Bldg A Electrical Rough in $32,519.50 4132 Exterior Improvements $19,407.63 4-401-4132-321633-1 Bldg A Concrete Driveways, Sidewalks, Patios $17,312.63 4-401-4132-323150-1 Bldg A Privacy Fence $2,095.00 4108 Openings $33,810.43 4-401-4108-085300-1 Bldg A Vinyl Windows & Patio Doors $13,428.24 4-401-4108-087100-1 Bldg A Door Hardware $1,958.19 4-401-4108-083300-1 Bldg A Garage Doors & Openers $10,364.00 4-401-4108-081100-1 Bldg A Exterior Metal Doors and Frames $8,060.00 4109 Finishes $92,146.80 4-401-4109-092010-1 Bldg A Drywall Firewalls $3,705.78 4-401-4109-092020-1 Bldg A Drywall $53,814.66 4-401-4109-096219-1 Bldg A Laminate Flooring $25,926.36 4-401-4109-099123-1 Bldg A Interior Painting & Caulking $8,700.00 4122 Plumbing $79,256.54 4-401-4122-221030-1 Bldg A Plumbing Finish $13,640.40 4-401-4122-224000-1 Bldg A Plumbing Fixtures $29,328.50 4-401-4122-221010-1 Bldg A Underground Plumbing (Groundwork) $18,100.44 4-401-4122-221020-1 Bldg A Plumbing Rough in $18,187.20 4123 HVAC $35,475.00 4-401-4123-231010-1 Bldg A HVAC Rough in $17,737.50 4-401-4123-231020-1 Bldg A HVAC Finish $17,737.50 4105 Metals $2,175.00 4-401-4105-055200-1 Bldg A Metal Railing $2,175.00 4112 Furnishings $8,868.18 4-401-4112-123640-1 Bldg A Stone Counter Tops $8,868.18 Redwood Holt Cedar Street MI P3 Cost Group: 401 - Building A
Page 5
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $532,991.39 4106 Wood & Plastics $113,052.31 4-402-4106-062000-2 Bldg B Interior Finish Carpentry Labor $4,750.00 4-402-4106-064000-3 Bldg B Interior Trim & Interior Doors Material $9,868.00 4-402-4106-064100-1 Bldg B Cabinets $11,928.31 4-402-4106-061010-2 Bldg B Rough Framing Labor $22,715.00 4-402-4106-061000-3 Bldg B Rough Framing Materials $63,791.00 4108 Openings $30,767.25 4-402-4108-085300-1 Bldg B Vinyl Windows & Patio Doors $14,575.73 4-402-4108-087100-1 Bldg B Door Hardware $1,660.12 4-402-4108-081100-1 Bldg B Exterior Metal Doors and Frames $5,435.00 4-402-4108-083300-1 Bldg B Garage Doors & Openers $9,096.40 4109 Finishes $80,296.83 4-402-4109-092010-1 Bldg B Drywall Firewalls $3,392.34 4-402-4109-092020-1 Bldg B Drywall $45,989.48 4-402-4109-099123-1 Bldg B Interior Painting & Caulking $7,250.00 4-402-4109-096219-1 Bldg B Laminate Flooring $23,665.01 4122 Plumbing $53,838.29 4-402-4122-221030-1 Bldg B Plumbing Finish $11,367.00 4-402-4122-224000-1 Bldg B Plumbing Fixtures $14,526.22 4-402-4122-221020-1 Bldg B Plumbing Rough in $15,156.00 4-402-4122-221010-1 Bldg B Underground Plumbing (Groundwork) $12,789.07 4123 HVAC $30,175.00 4-402-4123-231010-1 Bldg B HVAC Rough in $15,087.50 4-402-4123-231020-1 Bldg B HVAC Finish $15,087.50 4103 Concrete $60,788.88 4-402-4103-033100-1 Bldg B Foundation $57,237.59 4-402-4103-033150-1 Bldg B Slab on Grade $3,551.29 4104 Masonry $10,910.05 4-402-4104-044313-1 Bldg B Stone Masonry Veneer $10,910.05 4107 Thermal & Moisture Protection $63,277.01 4-402-4107-074634-2 Bldg B Vinyl Siding & Exterior Trim Labor $19,500.00 4-402-4107-072126-1 Bldg B Insulation Ceiling $8,925.00 4-402-4107-073113-3 Bldg B Roofing Material $17,892.01 4-402-4107-077123-1 Bldg B Gutters & Downspouts $2,500.00 4-402-4107-072120-1 Bldg B Insulation Walls $8,925.00 4-402-4107-073100-1 Bldg B Roofing Labor $5,535.00 4112 Furnishings $7,213.43 4-402-4112-123640-1 Bldg B Stone Counter Tops $7,213.43 4126 Electrical $49,667.11 4-402-4126-265000-1 Bldg B Electrical Fixtures $8,276.28 4-402-4126-260510-1 Bldg B Electrical Rough in $25,479.00 4-402-4126-260500-1 Bldg B Electrical Service Equipment $4,865.83 4-402-4126-260520-1 Bldg B Electrical Finish $11,046.00 4132 Exterior Improvements $30,830.23 4-402-4132-321633-1 Bldg B Concrete Driveways, Sidewalks, Patios $29,005.23 4-402-4132-323150-1 Bldg B Privacy Fence $1,825.00 4105 Metals $2,175.00 4-402-4105-055200-1 Bldg B Metal Railing $2,175.00 Redwood Holt Cedar Street MI P3 Cost Group: 402 - Building B
Page 6
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $417,805.35 4103 Concrete $62,258.67 4-403-4103-033150-1 Bldg C Slab on Grade $28,637.89 4-403-4103-033100-1 Bldg C Foundation $33,620.78 4104 Masonry $1,917.03 4-403-4104-044313-1 Bldg C Stone Masonry Veneer $1,917.03 4107 Thermal & Moisture Protection $49,705.20 4-403-4107-074634-2 Bldg C Vinyl Siding & Exterior Trim Labor $16,500.00 4-403-4107-077123-1 Bldg C Gutters & Downspouts $2,000.00 4-403-4107-072120-1 Bldg C Insulation Walls $7,140.00 4-403-4107-073100-1 Bldg C Roofing Labor $4,500.00 4-403-4107-072126-1 Bldg C Insulation Ceiling $7,140.00 4-403-4107-073113-3 Bldg C Roofing Material $12,425.20 4110 Specialties $4,160.00 4-403-4110-102223-1 Bldg C Patio Screens $4,160.00 4112 Furnishings $5,876.93 4-403-4112-123640-1 Bldg C Stone Counter Tops $5,876.93 4106 Wood & Plastics $91,176.22 4-403-4106-062000-2 Bldg C Interior Finish Carpentry Labor $3,800.00 4-403-4106-064000-3 Bldg C Interior Trim & Interior Doors Material $6,898.00 4-403-4106-064100-1 Bldg C Cabinets $9,856.22 4-403-4106-061000-3 Bldg C Rough Framing Materials $51,702.00 4-403-4106-061010-2 Bldg C Rough Framing Labor $18,920.00 4108 Openings $25,272.69 4-403-4108-087100-1 Bldg C Door Hardware $1,337.93 4-403-4108-083300-1 Bldg C Garage Doors & Openers $7,549.67 4-403-4108-081100-1 Bldg C Exterior Metal Doors and Frames $6,691.00 4-403-4108-085300-1 Bldg C Vinyl Windows & Patio Doors $9,694.09 4109 Finishes $62,627.28 4-403-4109-092010-1 Bldg C Drywall Firewalls $2,576.56 4-403-4109-092020-1 Bldg C Drywall $36,069.32 4-403-4109-096219-1 Bldg C Laminate Flooring $18,181.40 4-403-4109-099123-1 Bldg C Interior Painting & Caulking $5,800.00 4122 Plumbing $40,935.07 4-403-4122-224000-1 Bldg C Plumbing Fixtures $10,623.07 4-403-4122-221010-1 Bldg C Underground Plumbing (Groundwork) $9,093.60 4-403-4122-221030-1 Bldg C Plumbing Finish $9,093.60 4-403-4122-221020-1 Bldg C Plumbing Rough in $12,124.80 4123 HVAC $23,980.00 4-403-4123-231010-1 Bldg C HVAC Rough in $11,990.00 4-403-4123-231020-1 Bldg C HVAC Finish $11,990.00 4132 Exterior Improvements $7,398.03 4-403-4132-321633-1 Bldg C Concrete Driveways, Sidewalks, Patios $7,198.03 4-403-4132-323150-1 Bldg C Privacy Fence $200.00 4126 Electrical $42,498.23 4-403-4126-260500-1 Bldg C Electrical Service Equipment $3,810.76 4-403-4126-260520-1 Bldg C Electrical Finish $9,716.00 4-403-4126-260510-1 Bldg C Electrical Rough in $22,059.00 4-403-4126-265000-1 Bldg C Electrical Fixtures $6,912.47 Redwood Holt Cedar Street MI P3 Cost Group: 403 - Building C
Page 7
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $599,854.43 4106 Wood & Plastics $127,273.34 4-404-4106-062000-2 Bldg D Interior Finish Carpentry Labor $5,700.00 4-404-4106-064000-3 Bldg D Interior Trim & Interior Doors Material $11,631.00 4-404-4106-064100-1 Bldg D Cabinets $14,186.34 4-404-4106-061010-2 Bldg D Rough Framing Labor $25,660.00 4-404-4106-061000-3 Bldg D Rough Framing Materials $70,096.00 4107 Thermal & Moisture Protection $67,676.97 4-404-4107-072120-1 Bldg D Insulation Walls $10,710.00 4-404-4107-074634-2 Bldg D Vinyl Siding & Exterior Trim Labor $18,700.00 4-404-4107-077123-1 Bldg D Gutters & Downspouts $3,000.00 4-404-4107-072126-1 Bldg D Insulation Ceiling $10,710.00 4-404-4107-073113-3 Bldg D Roofing Material $18,346.97 4-404-4107-073100-1 Bldg D Roofing Labor $6,210.00 4108 Openings $31,491.54 4-404-4108-087100-1 Bldg D Door Hardware $1,965.13 4-404-4108-081100-1 Bldg D Exterior Metal Doors and Frames $6,523.00 4-404-4108-085300-1 Bldg D Vinyl Windows & Patio Doors $13,163.41 4-404-4108-083300-1 Bldg D Garage Doors & Openers $9,840.00 4109 Finishes $93,166.82 4-404-4109-092010-1 Bldg D Drywall Firewalls $4,208.16 4-404-4109-092020-1 Bldg D Drywall $54,051.16 4-404-4109-096219-1 Bldg D Laminate Flooring $26,207.50 4-404-4109-099123-1 Bldg D Interior Painting & Caulking $8,700.00 4122 Plumbing $61,608.24 4-404-4122-224000-1 Bldg D Plumbing Fixtures $16,140.24 4-404-4122-221020-1 Bldg D Plumbing Rough in $18,187.20 4-404-4122-221010-1 Bldg D Underground Plumbing (Groundwork) $13,640.40 4-404-4122-221030-1 Bldg D Plumbing Finish $13,640.40 4123 HVAC $34,950.00 4-404-4123-231010-1 Bldg D HVAC Rough in $17,475.00 4-404-4123-231020-1 Bldg D HVAC Finish $17,475.00 4103 Concrete $86,149.60 4-404-4103-033150-1 Bldg D Slab on Grade $7,986.38 4-404-4103-033100-1 Bldg D Foundation $78,163.22 4104 Masonry $2,645.27 4-404-4104-044313-1 Bldg D Stone Masonry Veneer $2,645.27 4105 Metals $1,600.00 4-404-4105-055200-1 Bldg D Metal Railing $1,600.00 4112 Furnishings $10,072.33 4-404-4112-122000-1 Bldg D Window Treatments $1,416.63 4-404-4112-123640-1 Bldg D Stone Counter Tops $8,655.70 4132 Exterior Improvements $25,331.64 4-404-4132-321633-1 Bldg D Concrete Driveways, Sidewalks, Patios $23,676.64 4-404-4132-323150-1 Bldg D Privacy Fence $1,655.00 4126 Electrical $57,888.68 4-404-4126-260510-1 Bldg D Electrical Rough in $30,136.00 4-404-4126-265000-1 Bldg D Electrical Fixtures $9,322.84 4-404-4126-260500-1 Bldg D Electrical Service Equipment $5,535.84 4-404-4126-260520-1 Bldg D Electrical Finish $12,894.00 Redwood Holt Cedar Street MI P3 Cost Group: 404 - Building D
Page 8
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $372,686.54 4104 Masonry $5,573.23 4-405-4104-044313-1 Bldg E Stone Masonry Veneer $5,573.23 4107 Thermal & Moisture Protection $48,545.20 4-405-4107-074634-2 Bldg E Vinyl Siding & Exterior Trim Labor $15,700.00 4-405-4107-077123-1 Bldg E Gutters & Downspouts $2,000.00 4-405-4107-072120-1 Bldg E Insulation Walls $7,140.00 4-405-4107-073100-1 Bldg E Roofing Labor $4,140.00 4-405-4107-072126-1 Bldg E Insulation Ceiling $7,140.00 4-405-4107-073113-3 Bldg E Roofing Material $12,425.20 4112 Furnishings $5,808.86 4-405-4112-123640-1 Bldg E Stone Counter Tops $5,808.86 4132 Exterior Improvements $7,032.48 4-405-4132-321633-1 Bldg E Concrete Driveways, Sidewalks, Patios $5,862.48 4-405-4132-323150-1 Bldg E Privacy Fence $1,170.00 4106 Wood & Plastics $84,580.48 4-405-4106-062000-2 Bldg E Interior Finish Carpentry Labor $3,800.00 4-405-4106-064000-3 Bldg E Interior Trim & Interior Doors Material $7,783.00 4-405-4106-064100-1 Bldg E Cabinets $9,620.48 4-405-4106-061000-3 Bldg E Rough Framing Materials $46,437.00 4-405-4106-061010-2 Bldg E Rough Framing Labor $16,940.00 4109 Finishes $61,757.92 4-405-4109-092010-1 Bldg E Drywall Firewalls $2,576.58 4-405-4109-092020-1 Bldg E Drywall $35,848.70 4-405-4109-096219-1 Bldg E Laminate Flooring $17,532.64 4-405-4109-099123-1 Bldg E Interior Painting & Caulking $5,800.00 4123 HVAC $23,300.00 4-405-4123-231010-1 Bldg E HVAC Rough in $11,650.00 4-405-4123-231020-1 Bldg E HVAC Finish $11,650.00 4126 Electrical $37,636.48 4-405-4126-260500-1 Bldg E Electrical Service Equipment $2,835.00 4-405-4126-260520-1 Bldg E Electrical Finish $8,596.00 4-405-4126-260510-1 Bldg E Electrical Rough in $19,979.00 4-405-4126-265000-1 Bldg E Electrical Fixtures $6,226.48 4103 Concrete $35,829.54 4-405-4103-033150-1 Bldg E Slab on Grade $2,544.24 4-405-4103-033100-1 Bldg E Foundation $33,285.30 4108 Openings $21,508.14 4-405-4108-083300-1 Bldg E Garage Doors & Openers $6,560.00 4-405-4108-087100-1 Bldg E Door Hardware $1,355.10 4-405-4108-081100-1 Bldg E Exterior Metal Doors and Frames $4,349.00 4-405-4108-085300-1 Bldg E Vinyl Windows & Patio Doors $9,244.04 4122 Plumbing $41,114.21 4-405-4122-221010-1 Bldg E Underground Plumbing (Groundwork) $9,093.60 4-405-4122-221030-1 Bldg E Plumbing Finish $9,093.60 4-405-4122-221020-1 Bldg E Plumbing Rough in $12,124.80 4-405-4122-224000-1 Bldg E Plumbing Fixtures $10,802.21 Redwood Holt Cedar Street MI P3 Cost Group: 405 - Building E
Page 9
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $437,869.30 4106 Wood & Plastics $84,502.09 4-406-4106-064000-3 Bldg F Interior Trim & Interior Doors Material $7,786.00 4-406-4106-064100-1 Bldg F Cabinets $9,539.09 4-406-4106-061010-2 Bldg F Rough Framing Labor $16,940.00 4-406-4106-061000-3 Bldg F Rough Framing Materials $46,437.00 4-406-4106-062000-2 Bldg F Interior Finish Carpentry Labor $3,800.00 4107 Thermal & Moisture Protection $48,545.20 4-406-4107-072120-1 Bldg F Insulation Walls $7,140.00 4-406-4107-072126-1 Bldg F Insulation Ceiling $7,140.00 4-406-4107-077123-1 Bldg F Gutters & Downspouts $2,000.00 4-406-4107-073113-3 Bldg F Roofing Material $12,425.20 4-406-4107-074634-2 Bldg F Vinyl Siding & Exterior Trim Labor $15,700.00 4-406-4107-073100-1 Bldg F Roofing Labor $4,140.00 4109 Finishes $61,758.12 4-406-4109-092010-1 Bldg F Drywall Firewalls $2,576.56 4-406-4109-092020-1 Bldg F Drywall $35,848.92 4-406-4109-096219-1 Bldg F Laminate Flooring $17,532.64 4-406-4109-099123-1 Bldg F Interior Painting & Caulking $5,800.00 4104 Masonry $5,648.85 4-406-4104-044313-1 Bldg F Stone Masonry Veneer $5,648.85 4123 HVAC $23,300.00 4-406-4123-231010-1 Bldg F HVAC Rough in $11,650.00 4-406-4123-231020-1 Bldg F HVAC Finish $11,650.00 4126 Electrical $37,753.02 4-406-4126-260500-1 Bldg F Electrical Service Equipment $2,835.00 4-406-4126-260510-1 Bldg F Electrical Rough in $19,979.00 4-406-4126-265000-1 Bldg F Electrical Fixtures $6,343.02 4-406-4126-260520-1 Bldg F Electrical Finish $8,596.00 4112 Furnishings $5,808.86 4-406-4112-123640-1 Bldg F Stone Counter Tops $5,808.86 4132 Exterior Improvements $38,983.05 4-406-4132-321633-1 Bldg F Concrete Driveways, Sidewalks, Patios $37,328.05 4-406-4132-323150-1 Bldg F Privacy Fence $1,655.00 4103 Concrete $69,253.04 4-406-4103-033100-1 Bldg F Foundation $69,253.04 4108 Openings $21,508.14 4-406-4108-081100-1 Bldg F Exterior Metal Doors and Frames $4,349.00 4-406-4108-085300-1 Bldg F Vinyl Windows & Patio Doors $9,244.04 4-406-4108-083300-1 Bldg F Garage Doors & Openers $6,560.00 4-406-4108-087100-1 Bldg F Door Hardware $1,355.10 4122 Plumbing $40,808.93 4-406-4122-221020-1 Bldg F Plumbing Rough in $12,124.80 4-406-4122-224000-1 Bldg F Plumbing Fixtures $10,496.93 4-406-4122-221010-1 Bldg F Underground Plumbing (Groundwork) $9,093.60 4-406-4122-221030-1 Bldg F Plumbing Finish $9,093.60 Redwood Holt Cedar Street MI P3 Cost Group: 406 - Building F
Page 10
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $631,037.99 4104 Masonry $6,120.29 4-407-4104-044313-1 Bldg G Stone Masonry Veneer $6,120.29 4105 Metals $2,275.00 4-407-4105-055200-1 Bldg G Metal Railing $2,275.00 4106 Wood & Plastics $127,023.34 4-407-4106-061000-3 Bldg G Rough Framing Materials $70,096.00 4-407-4106-064000-3 Bldg G Interior Trim & Interior Doors Material $11,631.00 4-407-4106-064100-1 Bldg G Cabinets $14,186.34 4-407-4106-062000-2 Bldg G Interior Finish Carpentry Labor $5,700.00 4-407-4106-061010-2 Bldg G Rough Framing Labor $25,410.00 4107 Thermal & Moisture Protection $68,328.55 4-407-4107-077123-1 Bldg G Gutters & Downspouts $3,000.00 4-407-4107-072120-1 Bldg G Insulation Walls $10,710.00 4-407-4107-072126-1 Bldg G Insulation Ceiling $10,710.00 4-407-4107-073100-1 Bldg G Roofing Labor $6,200.00 4-407-4107-073113-3 Bldg G Roofing Material $18,208.55 4-407-4107-074634-2 Bldg G Vinyl Siding & Exterior Trim Labor $19,500.00 4108 Openings $31,374.52 4-407-4108-081100-1 Bldg G Exterior Metal Doors and Frames $6,523.00 4-407-4108-083300-1 Bldg G Garage Doors & Openers $9,840.00 4-407-4108-087100-1 Bldg G Door Hardware $1,965.13 4-407-4108-085300-1 Bldg G Vinyl Windows & Patio Doors $13,046.39 4112 Furnishings $8,705.41 4-407-4112-123640-1 Bldg G Stone Counter Tops $8,705.41 4132 Exterior Improvements $36,853.25 4-407-4132-323150-1 Bldg G Privacy Fence $2,160.00 4-407-4132-321633-1 Bldg G Concrete Driveways, Sidewalks, Patios $34,693.25 4109 Finishes $93,120.20 4-407-4109-092020-1 Bldg G Drywall $54,004.56 4-407-4109-096219-1 Bldg G Laminate Flooring $26,207.50 4-407-4109-092010-1 Bldg G Drywall Firewalls $4,208.14 4-407-4109-099123-1 Bldg G Interior Painting & Caulking $8,700.00 4123 HVAC $34,950.00 4-407-4123-231010-1 Bldg G HVAC Rough in $17,475.00 4-407-4123-231020-1 Bldg G HVAC Finish $17,475.00 4126 Electrical $57,888.68 4-407-4126-260500-1 Bldg G Electrical Service Equipment $5,535.84 4-407-4126-260510-1 Bldg G Electrical Rough in $30,136.00 4-407-4126-260520-1 Bldg G Electrical Finish $12,894.00 4-407-4126-265000-1 Bldg G Electrical Fixtures $9,322.84 4103 Concrete $98,240.88 4-407-4103-033150-1 Bldg G Slab on Grade $1,738.41 4-407-4103-033100-1 Bldg G Foundation $96,502.47 4122 Plumbing $66,157.87 4-407-4122-221010-1 Bldg G Underground Plumbing (Groundwork) $18,123.19 4-407-4122-221030-1 Bldg G Plumbing Finish $13,640.40 4-407-4122-221020-1 Bldg G Plumbing Rough in $18,187.20 4-407-4122-224000-1 Bldg G Plumbing Fixtures $16,207.08 Redwood Holt Cedar Street MI P3 Cost Group: 407 - Building G
Page 11
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $494,936.22 4106 Wood & Plastics $105,761.71 4-408-4106-064100-1 Bldg H Cabinets $11,862.71 4-408-4106-061000-3 Bldg H Rough Framing Materials $58,267.00 4-408-4106-061010-2 Bldg H Rough Framing Labor $21,175.00 4-408-4106-064000-3 Bldg H Interior Trim & Interior Doors Material $9,707.00 4-408-4106-062000-2 Bldg H Interior Finish Carpentry Labor $4,750.00 4107 Thermal & Moisture Protection $57,784.97 4-408-4107-072120-1 Bldg H Insulation Walls $8,925.00 4-408-4107-072126-1 Bldg H Insulation Ceiling $8,925.00 4-408-4107-073100-1 Bldg H Roofing Labor $5,175.00 4-408-4107-077123-1 Bldg H Gutters & Downspouts $2,500.00 4-408-4107-073113-3 Bldg H Roofing Material $14,759.97 4-408-4107-074634-2 Bldg H Vinyl Siding & Exterior Trim Labor $17,500.00 4109 Finishes $77,426.16 4-408-4109-092020-1 Bldg H Drywall $44,913.73 4-408-4109-096219-1 Bldg H Laminate Flooring $21,870.07 4-408-4109-092010-1 Bldg H Drywall Firewalls $3,392.36 4-408-4109-099123-1 Bldg H Interior Painting & Caulking $7,250.00 4123 HVAC $29,125.00 4-408-4123-231020-1 Bldg H HVAC Finish $14,562.50 4-408-4123-231010-1 Bldg H HVAC Rough in $14,562.50 4126 Electrical $48,305.50 4-408-4126-260500-1 Bldg H Electrical Service Equipment $4,865.83 4-408-4126-260510-1 Bldg H Electrical Rough in $24,920.00 4-408-4126-265000-1 Bldg H Electrical Fixtures $7,774.67 4-408-4126-260520-1 Bldg H Electrical Finish $10,745.00 4104 Masonry $4,817.59 4-408-4104-044313-1 Bldg H Stone Masonry Veneer $4,817.59 4108 Openings $26,287.59 4-408-4108-081100-1 Bldg H Exterior Metal Doors and Frames $5,436.00 4-408-4108-085300-1 Bldg H Vinyl Windows & Patio Doors $10,991.47 4-408-4108-083300-1 Bldg H Garage Doors & Openers $8,200.00 4-408-4108-087100-1 Bldg H Door Hardware $1,660.12 4112 Furnishings $7,232.28 4-408-4112-123640-1 Bldg H Stone Counter Tops $7,232.28 4122 Plumbing $50,979.62 4-408-4122-221010-1 Bldg H Underground Plumbing (Groundwork) $11,367.00 4-408-4122-221020-1 Bldg H Plumbing Rough in $15,156.00 4-408-4122-224000-1 Bldg H Plumbing Fixtures $13,089.62 4-408-4122-221030-1 Bldg H Plumbing Finish $11,367.00 4132 Exterior Improvements $12,119.49 4-408-4132-323150-1 Bldg H Privacy Fence $1,655.00 4-408-4132-321633-1 Bldg H Concrete Driveways, Sidewalks, Patios $10,464.49 4103 Concrete $75,096.31 4-408-4103-033100-1 Bldg H Foundation $75,096.31 Redwood Holt Cedar Street MI P3 Cost Group: 408 - Building H
Page 12
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $407,792.78 4106 Wood & Plastics $85,198.73 4-410-4106-061000-3 Bldg J Rough Framing Materials $46,437.00 4-410-4106-061010-2 Bldg J Rough Framing Labor $17,040.00 4-410-4106-064000-3 Bldg J Interior Trim & Interior Doors Material $8,382.64 4-410-4106-062000-2 Bldg J Interior Finish Carpentry Labor $3,800.00 4-410-4106-064100-1 Bldg J Cabinets $9,539.09 4107 Thermal & Moisture Protection $48,545.20 4-410-4107-072120-1 Bldg J Insulation Walls $7,140.00 4-410-4107-072126-1 Bldg J Insulation Ceiling $7,140.00 4-410-4107-073100-1 Bldg J Roofing Labor $4,140.00 4-410-4107-073113-3 Bldg J Roofing Material $12,425.20 4-410-4107-077123-1 Bldg J Gutters & Downspouts $2,000.00 4-410-4107-074634-2 Bldg J Vinyl Siding & Exterior Trim Labor $15,700.00 4109 Finishes $61,758.12 4-410-4109-096219-1 Bldg J Laminate Flooring $17,532.64 4-410-4109-099123-1 Bldg J Interior Painting & Caulking $5,800.00 4-410-4109-092010-1 Bldg J Drywall Firewalls $2,576.58 4-410-4109-092020-1 Bldg J Drywall $35,848.90 4123 HVAC $23,300.00 4-410-4123-231020-1 Bldg J HVAC Finish $11,650.00 4-410-4123-231010-1 Bldg J HVAC Rough in $11,650.00 4126 Electrical $38,612.25 4-410-4126-260500-1 Bldg J Electrical Service Equipment $3,810.77 4-410-4126-260510-1 Bldg J Electrical Rough in $19,979.00 4-410-4126-260520-1 Bldg J Electrical Finish $8,596.00 4-410-4126-265000-1 Bldg J Electrical Fixtures $6,226.48 4108 Openings $22,023.23 4-410-4108-081100-1 Bldg J Exterior Metal Doors and Frames $4,349.00 4-410-4108-083300-1 Bldg J Garage Doors & Openers $6,560.00 4-410-4108-085300-1 Bldg J Vinyl Windows & Patio Doors $9,759.13 4-410-4108-087100-1 Bldg J Door Hardware $1,355.10 4112 Furnishings $5,808.86 4-410-4112-123640-1 Bldg J Stone Counter Tops $5,808.86 4122 Plumbing $40,808.93 4-410-4122-221010-1 Bldg J Underground Plumbing (Groundwork) $9,093.60 4-410-4122-221020-1 Bldg J Plumbing Rough in $12,124.80 4-410-4122-224000-1 Bldg J Plumbing Fixtures $10,496.93 4-410-4122-221030-1 Bldg J Plumbing Finish $9,093.60 4132 Exterior Improvements $13,135.39 4-410-4132-321633-1 Bldg J Concrete Driveways, Sidewalks, Patios $11,965.39 4-410-4132-323150-1 Bldg J Privacy Fence $1,170.00 4103 Concrete $62,716.37 4-410-4103-033100-1 Bldg J Foundation $62,716.37 4104 Masonry $5,885.70 4-410-4104-044313-1 Bldg J Stone Masonry Veneer $5,885.70 Redwood Holt Cedar Street MI P3 Cost Group: 410 - Building J
Page 13
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $491,523.91 4105 Metals $1,220.00 4-411-4105-055200-1 Bldg K Metal Railing $1,220.00 4106 Wood & Plastics $109,422.51 4-411-4106-061000-3 Bldg K Rough Framing Materials $61,044.00 4-411-4106-061010-2 Bldg K Rough Framing Labor $21,945.00 4-411-4106-062000-2 Bldg K Interior Finish Carpentry Labor $4,750.00 4-411-4106-064100-1 Bldg K Cabinets $11,895.51 4-411-4106-064000-3 Bldg K Interior Trim & Interior Doors Material $9,788.00 4107 Thermal & Moisture Protection $58,964.97 4-411-4107-077123-1 Bldg K Gutters & Downspouts $2,500.00 4-411-4107-072120-1 Bldg K Insulation Walls $8,925.00 4-411-4107-072126-1 Bldg K Insulation Ceiling $8,925.00 4-411-4107-073100-1 Bldg K Roofing Labor $5,355.00 4-411-4107-073113-3 Bldg K Roofing Material $14,759.97 4-411-4107-074634-2 Bldg K Vinyl Siding & Exterior Trim Labor $18,500.00 4108 Openings $27,635.65 4-411-4108-081100-1 Bldg K Exterior Metal Doors and Frames $5,436.00 4-411-4108-083300-1 Bldg K Garage Doors & Openers $8,200.00 4-411-4108-085300-1 Bldg K Vinyl Windows & Patio Doors $12,339.53 4-411-4108-087100-1 Bldg K Door Hardware $1,660.12 4112 Furnishings $7,222.85 4-411-4112-123640-1 Bldg K Stone Counter Tops $7,222.85 4122 Plumbing $51,470.66 4-411-4122-221010-1 Bldg K Underground Plumbing (Groundwork) $11,367.00 4-411-4122-221020-1 Bldg K Plumbing Rough in $15,156.00 4-411-4122-221030-1 Bldg K Plumbing Finish $11,367.00 4-411-4122-224000-1 Bldg K Plumbing Fixtures $13,580.66 4103 Concrete $47,769.31 4-411-4103-033100-1 Bldg K Foundation $41,787.56 4-411-4103-033150-1 Bldg K Slab on Grade $5,981.75 4109 Finishes $78,662.39 4-411-4109-099123-1 Bldg K Interior Painting & Caulking $7,250.00 4-411-4109-092020-1 Bldg K Drywall $45,252.49 4-411-4109-092010-1 Bldg K Drywall Firewalls $3,392.36 4-411-4109-096219-1 Bldg K Laminate Flooring $22,767.54 4123 HVAC $29,650.00 4-411-4123-231010-1 Bldg K HVAC Rough in $14,825.00 4-411-4123-231020-1 Bldg K HVAC Finish $14,825.00 4126 Electrical $49,225.56 4-411-4126-260500-1 Bldg K Electrical Service Equipment $4,865.83 4-411-4126-260510-1 Bldg K Electrical Rough in $25,199.50 4-411-4126-260520-1 Bldg K Electrical Finish $10,895.50 4-411-4126-265000-1 Bldg K Electrical Fixtures $8,264.73 4104 Masonry $7,810.98 4-411-4104-044313-1 Bldg K Stone Masonry Veneer $7,810.98 4132 Exterior Improvements $22,469.03 4-411-4132-323150-1 Bldg K Privacy Fence $1,355.00 4-411-4132-321633-1 Bldg K Concrete Driveways, Sidewalks, Patios $21,114.03 Redwood Holt Cedar Street MI P3 Cost Group: 411 - Building K
Page 14
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $392,374.88 4103 Concrete $57,830.40 4-412-4103-033100-1 Bldg L Foundation $54,607.50 4-412-4103-033150-1 Bldg L Slab on Grade $3,222.90 4107 Thermal & Moisture Protection $49,496.97 4-412-4107-072126-1 Bldg L Insulation Ceiling $7,140.00 4-412-4107-073100-1 Bldg L Roofing Labor $4,140.00 4-412-4107-073113-3 Bldg L Roofing Material $13,376.97 4-412-4107-072120-1 Bldg L Insulation Walls $7,140.00 4-412-4107-074634-2 Bldg L Vinyl Siding & Exterior Trim Labor $15,700.00 4-412-4107-077123-1 Bldg L Gutters & Downspouts $2,000.00 4109 Finishes $61,774.16 4-412-4109-099123-1 Bldg L Interior Painting & Caulking $5,800.00 4-412-4109-092010-1 Bldg L Drywall Firewalls $2,576.58 4-412-4109-096219-1 Bldg L Laminate Flooring $17,532.64 4-412-4109-092020-1 Bldg L Drywall $35,864.94 4126 Electrical $37,636.48 4-412-4126-260500-1 Bldg L Electrical Service Equipment $2,835.00 4-412-4126-260510-1 Bldg L Electrical Rough in $19,979.00 4-412-4126-260520-1 Bldg L Electrical Finish $8,596.00 4-412-4126-265000-1 Bldg L Electrical Fixtures $6,226.48 4105 Metals $1,150.00 4-412-4105-055200-1 Bldg L Metal Railing $1,150.00 4106 Wood & Plastics $84,499.09 4-412-4106-061000-3 Bldg L Rough Framing Materials $46,437.00 4-412-4106-061010-2 Bldg L Rough Framing Labor $16,940.00 4-412-4106-064000-3 Bldg L Interior Trim & Interior Doors Material $7,783.00 4-412-4106-062000-2 Bldg L Interior Finish Carpentry Labor $3,800.00 4-412-4106-064100-1 Bldg L Cabinets $9,539.09 4108 Openings $20,794.64 4-412-4108-081100-1 Bldg L Exterior Metal Doors and Frames $4,349.00 4-412-4108-083300-1 Bldg L Garage Doors & Openers $6,560.00 4-412-4108-085300-1 Bldg L Vinyl Windows & Patio Doors $8,530.54 4-412-4108-087100-1 Bldg L Door Hardware $1,355.10 4122 Plumbing $40,966.79 4-412-4122-221010-1 Bldg L Underground Plumbing (Groundwork) $9,093.60 4-412-4122-221020-1 Bldg L Plumbing Rough in $12,124.80 4-412-4122-221030-1 Bldg L Plumbing Finish $9,093.60 4-412-4122-224000-1 Bldg L Plumbing Fixtures $10,654.79 4104 Masonry $1,085.41 4-412-4104-044313-1 Bldg L Stone Masonry Veneer $1,085.41 4112 Furnishings $5,808.86 4-412-4112-123640-1 Bldg L Stone Counter Tops $5,808.86 4123 HVAC $23,300.00 4-412-4123-231020-1 Bldg L HVAC Finish $11,650.00 4-412-4123-231010-1 Bldg L HVAC Rough in $11,650.00 4132 Exterior Improvements $8,032.08 4-412-4132-321633-1 Bldg L Concrete Driveways, Sidewalks, Patios $6,377.08 4-412-4132-323150-1 Bldg L Privacy Fence $1,655.00 Redwood Holt Cedar Street MI P3 Cost Group: 412 - Building L
Page 15
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $403,956.61 4106 Wood & Plastics $90,276.22 4-413-4106-061000-3 Bldg M Rough Framing Materials $51,702.00 4-413-4106-061010-2 Bldg M Rough Framing Labor $18,920.00 4-413-4106-062000-2 Bldg M Interior Finish Carpentry Labor $3,800.00 4-413-4106-064100-1 Bldg M Cabinets $9,856.22 4-413-4106-064000-3 Bldg M Interior Trim & Interior Doors Material $5,998.00 4107 Thermal & Moisture Protection $50,987.30 4-413-4107-072126-1 Bldg M Insulation Ceiling $7,140.00 4-413-4107-073100-1 Bldg M Roofing Labor $4,500.00 4-413-4107-073113-3 Bldg M Roofing Material $12,707.30 4-413-4107-077123-1 Bldg M Gutters & Downspouts $2,000.00 4-413-4107-072120-1 Bldg M Insulation Walls $7,140.00 4-413-4107-074634-2 Bldg M Vinyl Siding & Exterior Trim Labor $17,500.00 4108 Openings $26,542.84 4-413-4108-081100-1 Bldg M Exterior Metal Doors and Frames $9,100.10 4-413-4108-083300-1 Bldg M Garage Doors & Openers $6,560.00 4-413-4108-085300-1 Bldg M Vinyl Windows & Patio Doors $9,544.81 4-413-4108-087100-1 Bldg M Door Hardware $1,337.93 4122 Plumbing $40,935.07 4-413-4122-221010-1 Bldg M Underground Plumbing (Groundwork) $9,093.60 4-413-4122-221020-1 Bldg M Plumbing Rough in $12,124.80 4-413-4122-221030-1 Bldg M Plumbing Finish $9,093.60 4-413-4122-224000-1 Bldg M Plumbing Fixtures $10,623.07 4103 Concrete $29,237.58 4-413-4103-033100-1 Bldg M Foundation $28,177.40 4-413-4103-033150-1 Bldg M Slab on Grade $1,060.18 4109 Finishes $64,027.30 4-413-4109-099123-1 Bldg M Interior Painting & Caulking $7,200.00 4-413-4109-092020-1 Bldg M Drywall $36,069.32 4-413-4109-092010-1 Bldg M Drywall Firewalls $2,576.58 4-413-4109-096219-1 Bldg M Laminate Flooring $18,181.40 4126 Electrical $41,659.62 4-413-4126-260500-1 Bldg M Electrical Service Equipment $2,972.15 4-413-4126-260510-1 Bldg M Electrical Rough in $22,059.00 4-413-4126-260520-1 Bldg M Electrical Finish $9,716.00 4-413-4126-265000-1 Bldg M Electrical Fixtures $6,912.47 4132 Exterior Improvements $28,925.72 4-413-4132-323150-1 Bldg M Privacy Fence $200.00 4-413-4132-321633-1 Bldg M Concrete Driveways, Sidewalks, Patios $26,370.28 4-413-4132-329100-1 Bldg M Building Landscaping $2,355.44 4104 Masonry $1,508.03 4-413-4104-044313-1 Bldg M Stone Masonry Veneer $1,508.03 4112 Furnishings $5,876.93 4-413-4112-123640-1 Bldg M Stone Counter Tops $5,876.93 4123 HVAC $23,980.00 4-413-4123-231010-1 Bldg M HVAC Rough in $11,990.00 4-413-4123-231020-1 Bldg M HVAC Finish $11,990.00 Redwood Holt Cedar Street MI P3 Cost Group: 413 - Building M
Page 16
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $400,145.06 4103 Concrete $46,205.90 4-414-4103-033100-1 Bldg N Foundation $46,205.90 4107 Thermal & Moisture Protection $48,565.29 4-414-4107-073100-1 Bldg N Roofing Labor $4,140.00 4-414-4107-073113-3 Bldg N Roofing Material $12,445.29 4-414-4107-074634-2 Bldg N Vinyl Siding & Exterior Trim Labor $15,700.00 4-414-4107-072120-1 Bldg N Insulation Walls $7,140.00 4-414-4107-072126-1 Bldg N Insulation Ceiling $7,140.00 4-414-4107-077123-1 Bldg N Gutters & Downspouts $2,000.00 4109 Finishes $61,758.12 4-414-4109-099123-1 Bldg N Interior Painting & Caulking $5,800.00 4-414-4109-092010-1 Bldg N Drywall Firewalls $2,576.58 4-414-4109-096219-1 Bldg N Laminate Flooring $17,532.64 4-414-4109-092020-1 Bldg N Drywall $35,848.90 4126 Electrical $37,636.48 4-414-4126-260510-1 Bldg N Electrical Rough in $19,979.00 4-414-4126-260520-1 Bldg N Electrical Finish $8,596.00 4-414-4126-265000-1 Bldg N Electrical Fixtures $6,226.48 4-414-4126-260500-1 Bldg N Electrical Service Equipment $2,835.00 4132 Exterior Improvements $24,013.51 4-414-4132-321633-1 Bldg N Concrete Driveways, Sidewalks, Patios $17,390.41 4-414-4132-329100-1 Bldg N Building Landscaping $4,968.10 4-414-4132-323150-1 Bldg N Privacy Fence $1,655.00 4106 Wood & Plastics $84,499.09 4-414-4106-061000-3 Bldg N Rough Framing Materials $46,437.00 4-414-4106-061010-2 Bldg N Rough Framing Labor $16,940.00 4-414-4106-064000-3 Bldg N Interior Trim & Interior Doors Material $7,783.00 4-414-4106-062000-2 Bldg N Interior Finish Carpentry Labor $3,800.00 4-414-4106-064100-1 Bldg N Cabinets $9,539.09 4108 Openings $21,103.92 4-414-4108-081100-1 Bldg N Exterior Metal Doors and Frames $4,349.00 4-414-4108-083300-1 Bldg N Garage Doors & Openers $6,560.00 4-414-4108-085300-1 Bldg N Vinyl Windows & Patio Doors $8,839.82 4-414-4108-087100-1 Bldg N Door Hardware $1,355.10 4122 Plumbing $40,808.93 4-414-4122-221010-1 Bldg N Underground Plumbing (Groundwork) $9,093.60 4-414-4122-221020-1 Bldg N Plumbing Rough in $12,124.80 4-414-4122-221030-1 Bldg N Plumbing Finish $9,093.60 4-414-4122-224000-1 Bldg N Plumbing Fixtures $10,496.93 4104 Masonry $5,367.15 4-414-4104-044313-1 Bldg N Stone Masonry Veneer $5,367.15 4112 Furnishings $6,886.67 4-414-4112-123640-1 Bldg N Stone Counter Tops $5,808.86 4-414-4112-122000-1 Bldg N Window Treatments $1,077.81 4123 HVAC $23,300.00 4-414-4123-231020-1 Bldg N HVAC Finish $11,650.00 4-414-4123-231010-1 Bldg N HVAC Rough in $11,650.00 Redwood Holt Cedar Street MI P3 Cost Group: 414 - Building N
Page 17
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $409,132.62 4103 Concrete $47,074.96 4-416-4103-033100-1 Bldg P Foundation $47,074.96 4104 Masonry $4,737.24 4-416-4104-044313-1 Bldg P Stone Masonry Veneer $4,737.24 4107 Thermal & Moisture Protection $51,171.83 4-416-4107-073113-3 Bldg P Roofing Material $12,591.83 4-416-4107-074634-2 Bldg P Vinyl Siding & Exterior Trim Labor $17,800.00 4-416-4107-072120-1 Bldg P Insulation Walls $7,140.00 4-416-4107-073100-1 Bldg P Roofing Labor $4,500.00 4-416-4107-072126-1 Bldg P Insulation Ceiling $7,140.00 4-416-4107-077123-1 Bldg P Gutters & Downspouts $2,000.00 4106 Wood & Plastics $91,183.53 4-416-4106-061010-2 Bldg P Rough Framing Labor $18,920.00 4-416-4106-062000-2 Bldg P Interior Finish Carpentry Labor $3,800.00 4-416-4106-061000-3 Bldg P Rough Framing Materials $51,702.00 4-416-4106-064000-3 Bldg P Interior Trim & Interior Doors Material $6,898.00 4-416-4106-064100-1 Bldg P Cabinets $9,863.53 4108 Openings $24,133.74 4-416-4108-083300-1 Bldg P Garage Doors & Openers $6,560.00 4-416-4108-085300-1 Bldg P Vinyl Windows & Patio Doors $9,544.81 4-416-4108-087100-1 Bldg P Door Hardware $1,337.93 4-416-4108-081100-1 Bldg P Exterior Metal Doors and Frames $6,691.00 4109 Finishes $62,627.30 4-416-4109-092010-1 Bldg P Drywall Firewalls $2,576.58 4-416-4109-099123-1 Bldg P Interior Painting & Caulking $5,800.00 4-416-4109-096219-1 Bldg P Laminate Flooring $18,181.40 4-416-4109-092020-1 Bldg P Drywall $36,069.32 4122 Plumbing $42,412.97 4-416-4122-221020-1 Bldg P Plumbing Rough in $12,124.80 4-416-4122-221030-1 Bldg P Plumbing Finish $9,093.60 4-416-4122-224000-1 Bldg P Plumbing Fixtures $10,623.05 4-416-4122-221010-1 Bldg P Underground Plumbing (Groundwork) $10,571.52 4126 Electrical $41,522.47 4-416-4126-260520-1 Bldg P Electrical Finish $9,716.00 4-416-4126-265000-1 Bldg P Electrical Fixtures $6,912.47 4-416-4126-260500-1 Bldg P Electrical Service Equipment $2,835.00 4-416-4126-260510-1 Bldg P Electrical Rough in $22,059.00 4132 Exterior Improvements $14,411.65 4-416-4132-321633-1 Bldg P Concrete Driveways, Sidewalks, Patios $14,211.65 4-416-4132-323150-1 Bldg P Privacy Fence $200.00 4123 HVAC $23,980.00 4-416-4123-231010-1 Bldg P HVAC Rough in $11,990.00 4-416-4123-231020-1 Bldg P HVAC Finish $11,990.00 4112 Furnishings $5,876.93 4-416-4112-123640-1 Bldg P Stone Counter Tops $5,876.93 Redwood Holt Cedar Street MI P3 Cost Group: 416 - Building P
Page 18
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $413,370.36 4106 Wood & Plastics $84,499.09 4-417-4106-062000-2 Bldg Q Interior Finish Carpentry Labor $3,800.00 4-417-4106-064000-3 Bldg Q Interior Trim & Interior Doors Material $7,783.00 4-417-4106-061010-2 Bldg Q Rough Framing Labor $16,940.00 4-417-4106-064100-1 Bldg Q Cabinets $9,539.09 4-417-4106-061000-3 Bldg Q Rough Framing Materials $46,437.00 4108 Openings $21,089.92 4-417-4108-083300-1 Bldg Q Garage Doors & Openers $6,536.00 4-417-4108-085300-1 Bldg Q Vinyl Windows & Patio Doors $8,849.82 4-417-4108-087100-1 Bldg Q Door Hardware $1,355.10 4-417-4108-081100-1 Bldg Q Exterior Metal Doors and Frames $4,349.00 4109 Finishes $61,775.43 4-417-4109-092010-1 Bldg Q Drywall Firewalls $2,576.56 4-417-4109-092020-1 Bldg Q Drywall $35,866.23 4-417-4109-099123-1 Bldg Q Interior Painting & Caulking $5,800.00 4-417-4109-096219-1 Bldg Q Laminate Flooring $17,532.64 4122 Plumbing $41,085.80 4-417-4122-221020-1 Bldg Q Plumbing Rough in $12,124.80 4-417-4122-221030-1 Bldg Q Plumbing Finish $9,093.60 4-417-4122-224000-1 Bldg Q Plumbing Fixtures $10,773.80 4-417-4122-221010-1 Bldg Q Underground Plumbing (Groundwork) $9,093.60 4123 HVAC $23,300.00 4-417-4123-231010-1 Bldg Q HVAC Rough in $11,650.00 4-417-4123-231020-1 Bldg Q HVAC Finish $11,650.00 4103 Concrete $68,199.00 4-417-4103-033100-1 Bldg Q Foundation $65,654.76 4-417-4103-033150-1 Bldg Q Slab on Grade $2,544.24 4104 Masonry $1,892.28 4-417-4104-044313-1 Bldg Q Stone Masonry Veneer $1,892.28 4107 Thermal & Moisture Protection $48,961.72 4-417-4107-073113-3 Bldg Q Roofing Material $12,841.72 4-417-4107-074634-2 Bldg Q Vinyl Siding & Exterior Trim Labor $15,700.00 4-417-4107-072126-1 Bldg Q Insulation Ceiling $7,140.00 4-417-4107-077123-1 Bldg Q Gutters & Downspouts $2,000.00 4-417-4107-072120-1 Bldg Q Insulation Walls $7,140.00 4-417-4107-073100-1 Bldg Q Roofing Labor $4,140.00 4126 Electrical $37,164.54 4-417-4126-260520-1 Bldg Q Electrical Finish $8,596.00 4-417-4126-265000-1 Bldg Q Electrical Fixtures $6,226.48 4-417-4126-260510-1 Bldg Q Electrical Rough in $19,979.00 4-417-4126-260500-1 Bldg Q Electrical Service Equipment $2,363.06 4132 Exterior Improvements $19,558.21 4-417-4132-321633-1 Bldg Q Concrete Driveways, Sidewalks, Patios $17,903.21 4-417-4132-323150-1 Bldg Q Privacy Fence $1,655.00 4112 Furnishings $5,844.37 4-417-4112-123640-1 Bldg Q Stone Counter Tops $5,844.37 Redwood Holt Cedar Street MI P3 Cost Group: 417 - Building Q
Page 19
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $586,533.69 4103 Concrete $65,398.64 4-418-4103-033100-1 Bldg R Foundation $65,398.64 4104 Masonry $6,258.14 4-418-4104-044313-1 Bldg R Stone Masonry Veneer $6,258.14 4107 Thermal & Moisture Protection $73,695.89 4-418-4107-073113-3 Bldg R Roofing Material $24,365.89 4-418-4107-074634-2 Bldg R Vinyl Siding & Exterior Trim Labor $18,700.00 4-418-4107-072120-1 Bldg R Insulation Walls $10,710.00 4-418-4107-073100-1 Bldg R Roofing Labor $6,210.00 4-418-4107-072126-1 Bldg R Insulation Ceiling $10,710.00 4-418-4107-077123-1 Bldg R Gutters & Downspouts $3,000.00 4126 Electrical $57,416.74 4-418-4126-265000-1 Bldg R Electrical Fixtures $9,322.84 4-418-4126-260500-1 Bldg R Electrical Service Equipment $5,063.90 4-418-4126-260520-1 Bldg R Electrical Finish $12,894.00 4-418-4126-260510-1 Bldg R Electrical Rough in $30,136.00 4132 Exterior Improvements $25,265.50 4-418-4132-321633-1 Bldg R Concrete Driveways, Sidewalks, Patios $23,610.50 4-418-4132-323150-1 Bldg R Privacy Fence $1,655.00 4106 Wood & Plastics $127,223.34 4-418-4106-062000-2 Bldg R Interior Finish Carpentry Labor $5,700.00 4-418-4106-064000-3 Bldg R Interior Trim & Interior Doors Material $11,631.00 4-418-4106-061000-3 Bldg R Rough Framing Materials $70,096.00 4-418-4106-061010-2 Bldg R Rough Framing Labor $25,610.00 4-418-4106-064100-1 Bldg R Cabinets $14,186.34 4108 Openings $30,854.92 4-418-4108-085300-1 Bldg R Vinyl Windows & Patio Doors $12,526.79 4-418-4108-087100-1 Bldg R Door Hardware $1,965.13 4-418-4108-083300-1 Bldg R Garage Doors & Openers $9,840.00 4-418-4108-081100-1 Bldg R Exterior Metal Doors and Frames $6,523.00 4109 Finishes $93,094.20 4-418-4109-092010-1 Bldg R Drywall Firewalls $4,208.14 4-418-4109-092020-1 Bldg R Drywall $53,978.56 4-418-4109-096219-1 Bldg R Laminate Flooring $26,207.50 4-418-4109-099123-1 Bldg R Interior Painting & Caulking $8,700.00 4122 Plumbing $63,720.62 4-418-4122-221030-1 Bldg R Plumbing Finish $13,640.40 4-418-4122-224000-1 Bldg R Plumbing Fixtures $15,682.32 4-418-4122-221010-1 Bldg R Underground Plumbing (Groundwork) $16,210.70 4-418-4122-221020-1 Bldg R Plumbing Rough in $18,187.20 4123 HVAC $34,950.00 4-418-4123-231010-1 Bldg R HVAC Rough in $17,475.00 4-418-4123-231020-1 Bldg R HVAC Finish $17,475.00 4112 Furnishings $8,655.70 4-418-4112-123640-1 Bldg R Stone Counter Tops $8,655.70 Redwood Holt Cedar Street MI P3 Cost Group: 418 - Building R
Page 20
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $485,598.24 4103 Concrete $32,714.67 4-419-4103-033100-1 Bldg S Foundation $32,714.67 4104 Masonry $6,368.77 4-419-4104-044313-1 Bldg S Stone Masonry Veneer $6,368.77 4107 Thermal & Moisture Protection $62,492.39 4-419-4107-074634-2 Bldg S Vinyl Siding & Exterior Trim Labor $18,000.00 4-419-4107-072126-1 Bldg S Insulation Ceiling $8,925.00 4-419-4107-073113-3 Bldg S Roofing Material $18,787.39 4-419-4107-077123-1 Bldg S Gutters & Downspouts $2,500.00 4-419-4107-072120-1 Bldg S Insulation Walls $8,925.00 4-419-4107-073100-1 Bldg S Roofing Labor $5,355.00 4106 Wood & Plastics $109,434.09 4-419-4106-062000-2 Bldg S Interior Finish Carpentry Labor $4,750.00 4-419-4106-064000-3 Bldg S Interior Trim & Interior Doors Material $9,788.00 4-419-4106-064100-1 Bldg S Cabinets $11,907.09 4-419-4106-061010-2 Bldg S Rough Framing Labor $21,945.00 4-419-4106-061000-3 Bldg S Rough Framing Materials $61,044.00 4108 Openings $27,845.22 4-419-4108-085300-1 Bldg S Vinyl Windows & Patio Doors $12,066.09 4-419-4108-087100-1 Bldg S Door Hardware $1,671.43 4-419-4108-081100-1 Bldg S Exterior Metal Doors and Frames $5,907.70 4-419-4108-083300-1 Bldg S Garage Doors & Openers $8,200.00 4109 Finishes $78,851.07 4-419-4109-092010-1 Bldg S Drywall Firewalls $3,392.36 4-419-4109-092020-1 Bldg S Drywall $45,441.17 4-419-4109-096219-1 Bldg S Laminate Flooring $22,767.54 4-419-4109-099123-1 Bldg S Interior Painting & Caulking $7,250.00 4122 Plumbing $54,972.87 4-419-4122-221030-1 Bldg S Plumbing Finish $11,367.00 4-419-4122-224000-1 Bldg S Plumbing Fixtures $13,089.62 4-419-4122-221020-1 Bldg S Plumbing Rough in $15,156.00 4-419-4122-221010-1 Bldg S Underground Plumbing (Groundwork) $15,360.25 4123 HVAC $29,650.00 4-419-4123-231010-1 Bldg S HVAC Rough in $14,825.00 4-419-4123-231020-1 Bldg S HVAC Finish $14,825.00 4112 Furnishings $7,222.85 4-419-4112-123640-1 Bldg S Stone Counter Tops $7,222.85 4126 Electrical $48,514.35 4-419-4126-265000-1 Bldg S Electrical Fixtures $8,025.47 4-419-4126-260510-1 Bldg S Electrical Rough in $25,199.50 4-419-4126-260500-1 Bldg S Electrical Service Equipment $4,393.88 4-419-4126-260520-1 Bldg S Electrical Finish $10,895.50 4132 Exterior Improvements $27,531.96 4-419-4132-321633-1 Bldg S Concrete Driveways, Sidewalks, Patios $25,826.96 4-419-4132-323150-1 Bldg S Privacy Fence $1,705.00 Redwood Holt Cedar Street MI P3 Cost Group: 419 - Building S
Page 21
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $527,975.44 4103 Concrete $55,556.44 4-420-4103-033150-1 Bldg T Slab on Grade $18,163.64 4-420-4103-033100-1 Bldg T Foundation $37,392.80 4104 Masonry $6,739.90 4-420-4104-044313-1 Bldg T Stone Masonry Veneer $6,739.90 4105 Metals $1,220.00 4-420-4105-055200-1 Bldg T Metal Railing $1,220.00 4107 Thermal & Moisture Protection $59,423.71 4-420-4107-074634-2 Bldg T Vinyl Siding & Exterior Trim Labor $18,500.00 4-420-4107-077123-1 Bldg T Gutters & Downspouts $2,500.00 4-420-4107-072120-1 Bldg T Insulation Walls $8,925.00 4-420-4107-073100-1 Bldg T Roofing Labor $5,355.00 4-420-4107-072126-1 Bldg T Insulation Ceiling $8,925.00 4-420-4107-073113-3 Bldg T Roofing Material $15,218.71 4112 Furnishings $7,222.85 4-420-4112-123640-1 Bldg T Stone Counter Tops $7,222.85 4132 Exterior Improvements $45,183.23 4-420-4132-321633-1 Bldg T Concrete Driveways, Sidewalks, Patios $43,828.23 4-420-4132-323150-1 Bldg T Privacy Fence $1,355.00 4106 Wood & Plastics $109,511.81 4-420-4106-062000-2 Bldg T Interior Finish Carpentry Labor $4,750.00 4-420-4106-064000-3 Bldg T Interior Trim & Interior Doors Material $9,788.00 4-420-4106-064100-1 Bldg T Cabinets $11,895.51 4-420-4106-061000-3 Bldg T Rough Framing Materials $61,044.00 4-420-4106-061010-2 Bldg T Rough Framing Labor $22,034.30 4108 Openings $30,327.98 4-420-4108-087100-1 Bldg T Door Hardware $1,660.12 4-420-4108-083300-1 Bldg T Garage Doors & Openers $8,200.00 4-420-4108-081100-1 Bldg T Exterior Metal Doors and Frames $8,446.62 4-420-4108-085300-1 Bldg T Vinyl Windows & Patio Doors $12,021.24 4109 Finishes $80,601.07 4-420-4109-092010-1 Bldg T Drywall Firewalls $3,392.36 4-420-4109-092020-1 Bldg T Drywall $45,441.17 4-420-4109-096219-1 Bldg T Laminate Flooring $22,767.54 4-420-4109-099123-1 Bldg T Interior Painting & Caulking $9,000.00 4122 Plumbing $54,211.40 4-420-4122-224000-1 Bldg T Plumbing Fixtures $13,089.62 4-420-4122-221010-1 Bldg T Underground Plumbing (Groundwork) $14,598.78 4-420-4122-221030-1 Bldg T Plumbing Finish $11,367.00 4-420-4122-221020-1 Bldg T Plumbing Rough in $15,156.00 4123 HVAC $29,650.00 4-420-4123-231010-1 Bldg T HVAC Rough in $14,825.00 4-420-4123-231020-1 Bldg T HVAC Finish $14,825.00 4126 Electrical $48,327.05 4-420-4126-260500-1 Bldg T Electrical Service Equipment $4,206.58 4-420-4126-260520-1 Bldg T Electrical Finish $10,895.50 4-420-4126-260510-1 Bldg T Electrical Rough in $25,199.50 4-420-4126-265000-1 Bldg T Electrical Fixtures $8,025.47 Redwood Holt Cedar Street MI P3 Cost Group: 420 - Building T
Page 22
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $429,229.79 4109 Finishes $64,027.30 4-421-4109-092020-1 Bldg U Drywall $36,069.32 4-421-4109-096219-1 Bldg U Laminate Flooring $18,181.40 4-421-4109-099123-1 Bldg U Interior Painting & Caulking $7,200.00 4-421-4109-092010-1 Bldg U Drywall Firewalls $2,576.58 4122 Plumbing $41,111.07 4-421-4122-224000-1 Bldg U Plumbing Fixtures $10,623.07 4-421-4122-221020-1 Bldg U Plumbing Rough in $12,124.80 4-421-4122-221010-1 Bldg U Underground Plumbing (Groundwork) $9,269.60 4-421-4122-221030-1 Bldg U Plumbing Finish $9,093.60 4123 HVAC $27,863.56 4-421-4123-231010-1 Bldg U HVAC Rough in $15,873.56 4-421-4123-231020-1 Bldg U HVAC Finish $11,990.00 4110 Specialties $4,160.00 4-421-4110-102223-1 Bldg U Patio Screens $4,160.00 4126 Electrical $41,976.04 4-421-4126-260510-1 Bldg U Electrical Rough in $22,059.00 4-421-4126-265000-1 Bldg U Electrical Fixtures $6,912.47 4-421-4126-260520-1 Bldg U Electrical Finish $9,716.00 4-421-4126-260500-1 Bldg U Electrical Service Equipment $3,288.57 4106 Wood & Plastics $91,344.19 4-421-4106-062000-2 Bldg U Interior Finish Carpentry Labor $3,800.00 4-421-4106-064000-3 Bldg U Interior Trim & Interior Doors Material $6,898.00 4-421-4106-064100-1 Bldg U Cabinets $9,952.75 4-421-4106-061010-2 Bldg U Rough Framing Labor $18,991.44 4-421-4106-061000-3 Bldg U Rough Framing Materials $51,702.00 4107 Thermal & Moisture Protection $52,812.85 4-421-4107-072120-1 Bldg U Insulation Walls $7,140.00 4-421-4107-074634-2 Bldg U Vinyl Siding & Exterior Trim Labor $18,000.00 4-421-4107-077123-1 Bldg U Gutters & Downspouts $2,000.00 4-421-4107-072126-1 Bldg U Insulation Ceiling $7,140.00 4-421-4107-073113-3 Bldg U Roofing Material $13,532.85 4-421-4107-073100-1 Bldg U Roofing Labor $5,000.00 4108 Openings $24,674.95 4-421-4108-087100-1 Bldg U Door Hardware $1,337.93 4-421-4108-081100-1 Bldg U Exterior Metal Doors and Frames $6,691.00 4-421-4108-085300-1 Bldg U Vinyl Windows & Patio Doors $10,086.02 4-421-4108-083300-1 Bldg U Garage Doors & Openers $6,560.00 4103 Concrete $46,350.41 4-421-4103-033100-1 Bldg U Foundation $46,350.41 4104 Masonry $4,704.26 4-421-4104-044313-1 Bldg U Stone Masonry Veneer $4,704.26 4112 Furnishings $7,828.52 4-421-4112-123640-1 Bldg U Stone Counter Tops $7,828.52 4132 Exterior Improvements $22,376.64 4-421-4132-321633-1 Bldg U Concrete Driveways, Sidewalks, Patios $22,176.64 4-421-4132-323150-1 Bldg U Privacy Fence $200.00 Redwood Holt Cedar Street MI P3 Cost Group: 421 - Building U
Page 23
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $431,143.07 4104 Masonry $5,896.65 4-422-4104-044313-1 Bldg V Stone Masonry Veneer $5,896.65 4107 Thermal & Moisture Protection $51,725.29 4-422-4107-074634-2 Bldg V Vinyl Siding & Exterior Trim Labor $18,000.00 4-422-4107-077123-1 Bldg V Gutters & Downspouts $2,000.00 4-422-4107-073100-1 Bldg V Roofing Labor $5,000.00 4-422-4107-072120-1 Bldg V Insulation Walls $7,140.00 4-422-4107-072126-1 Bldg V Insulation Ceiling $7,140.00 4-422-4107-073113-3 Bldg V Roofing Material $12,445.29 4110 Specialties $4,160.00 4-422-4110-102223-1 Bldg V Patio Screens $4,160.00 4112 Furnishings $7,246.02 4-422-4112-123640-1 Bldg V Stone Counter Tops $7,246.02 4132 Exterior Improvements $22,376.64 4-422-4132-321633-1 Bldg V Concrete Driveways, Sidewalks, Patios $22,176.64 4-422-4132-323150-1 Bldg V Privacy Fence $200.00 4103 Concrete $53,505.09 4-422-4103-033100-1 Bldg V Foundation $53,505.09 4106 Wood & Plastics $91,247.66 4-422-4106-061000-3 Bldg V Rough Framing Materials $51,702.00 4-422-4106-062000-2 Bldg V Interior Finish Carpentry Labor $3,800.00 4-422-4106-064000-3 Bldg V Interior Trim & Interior Doors Material $6,898.00 4-422-4106-064100-1 Bldg V Cabinets $9,856.22 4-422-4106-061010-2 Bldg V Rough Framing Labor $18,991.44 4108 Openings $23,408.04 4-422-4108-083300-1 Bldg V Garage Doors & Openers $6,560.00 4-422-4108-087100-1 Bldg V Door Hardware $1,337.93 4-422-4108-081100-1 Bldg V Exterior Metal Doors and Frames $6,977.00 4-422-4108-085300-1 Bldg V Vinyl Windows & Patio Doors $8,533.11 4109 Finishes $64,027.30 4-422-4109-092010-1 Bldg V Drywall Firewalls $2,576.58 4-422-4109-092020-1 Bldg V Drywall $36,069.32 4-422-4109-096219-1 Bldg V Laminate Flooring $18,181.40 4-422-4109-099123-1 Bldg V Interior Painting & Caulking $7,200.00 4122 Plumbing $40,935.07 4-422-4122-221010-1 Bldg V Underground Plumbing (Groundwork) $9,093.60 4-422-4122-221030-1 Bldg V Plumbing Finish $9,093.60 4-422-4122-221020-1 Bldg V Plumbing Rough in $12,124.80 4-422-4122-224000-1 Bldg V Plumbing Fixtures $10,623.07 4126 Electrical $42,635.31 4-422-4126-260520-1 Bldg V Electrical Finish $9,716.00 4-422-4126-260500-1 Bldg V Electrical Service Equipment $3,947.84 4-422-4126-260510-1 Bldg V Electrical Rough in $22,059.00 4-422-4126-265000-1 Bldg V Electrical Fixtures $6,912.47 4123 HVAC $23,980.00 4-422-4123-231010-1 Bldg V HVAC Rough in $11,990.00 4-422-4123-231020-1 Bldg V HVAC Finish $11,990.00 Redwood Holt Cedar Street MI P3 Cost Group: 422 - Building V
Page 24
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $424,094.23 4106 Wood & Plastics $78,920.32 4-423-4106-064000-3 Bldg W Interior Trim & Interior Doors Material $7,864.00 4-423-4106-064100-1 Bldg W Cabinets $9,571.88 4-423-4106-061010-2 Bldg W Rough Framing Labor $19,220.44 4-423-4106-061000-3 Bldg W Rough Framing Materials $38,464.00 4-423-4106-062000-2 Bldg W Interior Finish Carpentry Labor $3,800.00 4107 Thermal & Moisture Protection $50,225.29 4-423-4107-072120-1 Bldg W Insulation Walls $7,140.00 4-423-4107-072126-1 Bldg W Insulation Ceiling $7,140.00 4-423-4107-073113-3 Bldg W Roofing Material $12,445.29 4-423-4107-074634-2 Bldg W Vinyl Siding & Exterior Trim Labor $16,700.00 4-423-4107-077123-1 Bldg W Gutters & Downspouts $2,000.00 4-423-4107-073100-1 Bldg W Roofing Labor $4,800.00 4109 Finishes $64,582.99 4-423-4109-092010-1 Bldg W Drywall Firewalls $2,576.58 4-423-4109-092020-1 Bldg W Drywall $36,376.34 4-423-4109-096219-1 Bldg W Laminate Flooring $18,430.07 4-423-4109-099123-1 Bldg W Interior Painting & Caulking $7,200.00 4123 HVAC $23,825.00 4-423-4123-231010-1 Bldg W HVAC Rough in $11,912.50 4-423-4123-231020-1 Bldg W HVAC Finish $11,912.50 4126 Electrical $39,430.13 4-423-4126-260500-1 Bldg W Electrical Service Equipment $3,947.84 4-423-4126-260510-1 Bldg W Electrical Rough in $20,258.50 4-423-4126-265000-1 Bldg W Electrical Fixtures $6,477.29 4-423-4126-260520-1 Bldg W Electrical Finish $8,746.50 4103 Concrete $67,659.92 4-423-4103-033100-1 Bldg W Foundation $67,659.92 4108 Openings $23,145.44 4-423-4108-081100-1 Bldg W Exterior Metal Doors and Frames $4,349.00 4-423-4108-085300-1 Bldg W Vinyl Windows & Patio Doors $10,881.34 4-423-4108-083300-1 Bldg W Garage Doors & Openers $6,560.00 4-423-4108-087100-1 Bldg W Door Hardware $1,355.10 4122 Plumbing $40,906.30 4-423-4122-221020-1 Bldg W Plumbing Rough in $12,124.80 4-423-4122-224000-1 Bldg W Plumbing Fixtures $10,594.30 4-423-4122-221010-1 Bldg W Underground Plumbing (Groundwork) $9,093.60 4-423-4122-221030-1 Bldg W Plumbing Finish $9,093.60 4104 Masonry $7,622.75 4-423-4104-044313-1 Bldg W Stone Masonry Veneer $7,622.75 4112 Furnishings $7,729.45 4-423-4112-123640-1 Bldg W Stone Counter Tops $7,729.45 4132 Exterior Improvements $20,046.64 4-423-4132-321633-1 Bldg W Concrete Driveways, Sidewalks, Patios $19,176.64 4-423-4132-323150-1 Bldg W Privacy Fence $870.00 Redwood Holt Cedar Street MI P3 Cost Group: 423 - Building W
Page 25
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $220,340.25 4104 Masonry $7,246.60 4-424-4104-044313-1 Bldg X Stone Masonry Veneer $7,246.60 4103 Concrete $22,160.79 4-424-4103-033100-1 Bldg X Foundation $22,160.79 4106 Wood & Plastics $46,379.25 4-424-4106-062000-2 Bldg X Interior Finish Carpentry Labor $1,900.00 4-424-4106-061000-3 Bldg X Rough Framing Materials $25,888.00 4-424-4106-064000-3 Bldg X Interior Trim & Interior Doors Material $3,449.00 4-424-4106-064100-1 Bldg X Cabinets $4,928.11 4-424-4106-061010-2 Bldg X Rough Framing Labor $10,214.14 4107 Thermal & Moisture Protection $29,434.12 4-424-4107-073100-1 Bldg X Roofing Labor $2,500.00 4-424-4107-077123-1 Bldg X Gutters & Downspouts $1,000.00 4-424-4107-072120-1 Bldg X Insulation Walls $3,570.00 4-424-4107-072126-1 Bldg X Insulation Ceiling $3,570.00 4-424-4107-073113-3 Bldg X Roofing Material $5,794.12 4-424-4107-074634-2 Bldg X Vinyl Siding & Exterior Trim Labor $13,000.00 4108 Openings $12,387.45 4-424-4108-081100-1 Bldg X Exterior Metal Doors and Frames $3,580.00 4-424-4108-083300-1 Bldg X Garage Doors & Openers $3,280.00 4-424-4108-087100-1 Bldg X Door Hardware $736.49 4-424-4108-085300-1 Bldg X Vinyl Windows & Patio Doors $4,790.96 4110 Specialties $2,080.00 4-424-4110-102223-1 Bldg X Patio Screens $2,080.00 4112 Furnishings $3,527.25 4-424-4112-123640-1 Bldg X Stone Counter Tops $3,527.25 4132 Exterior Improvements $9,805.41 4-424-4132-323150-1 Bldg X Privacy Fence $200.00 4-424-4132-321633-1 Bldg X Concrete Driveways, Sidewalks, Patios $9,605.41 4122 Plumbing $23,328.69 4-424-4122-221010-1 Bldg X Underground Plumbing (Groundwork) $7,407.96 4-424-4122-221030-1 Bldg X Plumbing Finish $4,546.80 4-424-4122-221020-1 Bldg X Plumbing Rough in $6,062.40 4-424-4122-224000-1 Bldg X Plumbing Fixtures $5,311.53 4123 HVAC $11,990.00 4-424-4123-231010-1 Bldg X HVAC Rough in $5,995.00 4-424-4123-231020-1 Bldg X HVAC Finish $5,995.00 4126 Electrical $21,257.02 4-424-4126-260520-1 Bldg X Electrical Finish $4,858.00 4-424-4126-260500-1 Bldg X Electrical Service Equipment $1,970.79 4-424-4126-260510-1 Bldg X Electrical Rough in $10,972.00 4-424-4126-265000-1 Bldg X Electrical Fixtures $3,456.23 4109 Finishes $30,743.67 4-424-4109-092020-1 Bldg X Drywall $17,107.95 4-424-4109-096219-1 Bldg X Laminate Flooring $9,090.70 4-424-4109-092010-1 Bldg X Drywall Firewalls $945.02 4-424-4109-099123-1 Bldg X Interior Painting & Caulking $3,600.00 Redwood Holt Cedar Street MI P3 Cost Group: 424 - Building X
Page 26
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $420,328.89 4106 Wood & Plastics $91,891.12 4-425-4106-064100-1 Bldg Y Cabinets $9,604.68 4-425-4106-061010-2 Bldg Y Rough Framing Labor $18,551.44 4-425-4106-064000-3 Bldg Y Interior Trim & Interior Doors Material $7,944.00 4-425-4106-061000-3 Bldg Y Rough Framing Materials $51,991.00 4-425-4106-062000-2 Bldg Y Interior Finish Carpentry Labor $3,800.00 4107 Thermal & Moisture Protection $50,725.29 4-425-4107-072120-1 Bldg Y Insulation Walls $7,140.00 4-425-4107-072126-1 Bldg Y Insulation Ceiling $7,140.00 4-425-4107-073100-1 Bldg Y Roofing Labor $5,000.00 4-425-4107-073113-3 Bldg Y Roofing Material $12,445.29 4-425-4107-074634-2 Bldg Y Vinyl Siding & Exterior Trim Labor $17,000.00 4-425-4107-077123-1 Bldg Y Gutters & Downspouts $2,000.00 4109 Finishes $66,007.93 4-425-4109-092020-1 Bldg Y Drywall $36,903.78 4-425-4109-096219-1 Bldg Y Laminate Flooring $19,327.57 4-425-4109-092010-1 Bldg Y Drywall Firewalls $2,576.58 4-425-4109-099123-1 Bldg Y Interior Painting & Caulking $7,200.00 4123 HVAC $24,350.00 4-425-4123-231020-1 Bldg Y HVAC Finish $12,175.00 4-425-4123-231010-1 Bldg Y HVAC Rough in $12,175.00 4126 Electrical $36,909.53 4-425-4126-260500-1 Bldg Y Electrical Service Equipment $746.43 4-425-4126-260510-1 Bldg Y Electrical Rough in $20,538.00 4-425-4126-265000-1 Bldg Y Electrical Fixtures $6,728.10 4-425-4126-260520-1 Bldg Y Electrical Finish $8,897.00 4103 Concrete $46,104.19 4-425-4103-033100-1 Bldg Y Foundation $46,104.19 4104 Masonry $4,751.05 4-425-4104-044313-1 Bldg Y Stone Masonry Veneer $4,751.05 4108 Openings $23,868.30 4-425-4108-085300-1 Bldg Y Vinyl Windows & Patio Doors $11,604.20 4-425-4108-081100-1 Bldg Y Exterior Metal Doors and Frames $4,349.00 4-425-4108-083300-1 Bldg Y Garage Doors & Openers $6,560.00 4-425-4108-087100-1 Bldg Y Door Hardware $1,355.10 4122 Plumbing $42,440.55 4-425-4122-221020-1 Bldg Y Plumbing Rough in $12,124.80 4-425-4122-224000-1 Bldg Y Plumbing Fixtures $10,496.93 4-425-4122-221010-1 Bldg Y Underground Plumbing (Groundwork) $10,725.22 4-425-4122-221030-1 Bldg Y Plumbing Finish $9,093.60 4132 Exterior Improvements $26,738.20 4-425-4132-321633-1 Bldg Y Concrete Driveways, Sidewalks, Patios $25,683.20 4-425-4132-323150-1 Bldg Y Privacy Fence $1,055.00 4112 Furnishings $6,542.73 4-425-4112-123640-1 Bldg Y Stone Counter Tops $6,542.73 Redwood Holt Cedar Street MI P3 Cost Group: 425 - Building Y
Page 27
A B G ItemNo. Description of Work AIA Summary Total Completed and Stored to Date (D+E+F) $542,494.83 4106 Wood & Plastics $113,726.64 4-426-4106-061000-3 Bldg Z Rough Framing Materials $64,376.12 4-426-4106-061010-2 Bldg Z Rough Framing Labor $22,804.22 4-426-4106-062000-2 Bldg Z Interior Finish Carpentry Labor $4,750.00 4-426-4106-064100-1 Bldg Z Cabinets $11,928.30 4-426-4106-064000-3 Bldg Z Interior Trim & Interior Doors Material $9,868.00 4107 Thermal & Moisture Protection $59,681.89 4-426-4107-077123-1 Bldg Z Gutters & Downspouts $2,500.00 4-426-4107-072120-1 Bldg Z Insulation Walls $8,925.00 4-426-4107-072126-1 Bldg Z Insulation Ceiling $8,925.00 4-426-4107-073100-1 Bldg Z Roofing Labor $6,150.00 4-426-4107-073113-3 Bldg Z Roofing Material $15,181.89 4-426-4107-074634-2 Bldg Z Vinyl Siding & Exterior Trim Labor $18,000.00 4108 Openings $29,025.56 4-426-4108-081100-1 Bldg Z Exterior Metal Doors and Frames $5,595.00 4-426-4108-083300-1 Bldg Z Garage Doors & Openers $8,200.00 4-426-4108-087100-1 Bldg Z Door Hardware $1,660.12 4-426-4108-085300-1 Bldg Z Vinyl Windows & Patio Doors $13,570.44 4112 Furnishings $8,897.76 4-426-4112-123640-1 Bldg Z Stone Counter Tops $8,897.76 4103 Concrete $79,136.73 4-426-4103-033100-1 Bldg Z Foundation $79,136.73 4104 Masonry $7,680.38 4-426-4104-044313-1 Bldg Z Stone Masonry Veneer $7,680.38 4109 Finishes $82,025.98 4-426-4109-092020-1 Bldg Z Drywall $45,968.61 4-426-4109-096219-1 Bldg Z Laminate Flooring $23,665.01 4-426-4109-099123-1 Bldg Z Interior Painting & Caulking $9,000.00 4-426-4109-092010-1 Bldg Z Drywall Firewalls $3,392.36 4122 Plumbing $55,745.90 4-426-4122-221030-1 Bldg Z Plumbing Finish $11,367.00 4-426-4122-221010-1 Bldg Z Underground Plumbing (Groundwork) $16,133.28 4-426-4122-221020-1 Bldg Z Plumbing Rough in $15,156.00 4-426-4122-224000-1 Bldg Z Plumbing Fixtures $13,089.62 4123 HVAC $30,175.00 4-426-4123-231010-1 Bldg Z HVAC Rough in $15,087.50 4-426-4123-231020-1 Bldg Z HVAC Finish $15,087.50 4132 Exterior Improvements $26,731.85 4-426-4132-323150-1 Bldg Z Privacy Fence $1,825.00 4-426-4132-321633-1 Bldg Z Concrete Driveways, Sidewalks, Patios $24,906.85 4126 Electrical $49,667.14 4-426-4126-260500-1 Bldg Z Electrical Service Equipment $4,865.86 4-426-4126-260510-1 Bldg Z Electrical Rough in $25,479.00 4-426-4126-260520-1 Bldg Z Electrical Finish $11,046.00 4-426-4126-265000-1 Bldg Z Electrical Fixtures $8,276.28 Redwood Holt Cedar Street MI P3 Cost Group: 426 - Building Z